background image

DRIESCHER 

 WEGBERG

 

 

 

MINEX

®

-E

 7 

 

 

Additional hints to extend an existing switchgear 

 

 

 
The switchgear has to be isolated according to the safety rules! 

 

Expand an end cubicle  

 
Dismantle the voltage-proof tubing plugs on the 
side to expand the existing switchgear. 
Assemble the 6 cylinder head screws (4) into the 
free upper threads and act further on as 
described under point 4 and 5. 
 

 

 

 

 
 
Remove 3 screws at each phase, reuse one of 
them!  
 

 

Assembly of the tubing plugs in the new end 
cubicle 

 
Remove the nine non-sealed screws (see point 4) 
on that side of the cubicle, where the voltage-
proof tubing plugs have to be installed.  
Three of the screws have to be screwed in the 
remaining free threads of the switchgear to 
expand. 
Purify the tubing plugs and coat them with the 
delivered fitting lubricant (2). 
Assemble the voltage-proof tubing plugs.  
 

 

 

 

Do not loosen sealed screws.  

 

 
 
 

For coupling of the switching cubicles please proceed as described  

under point 1 – 14! 

 

 

If you have questions please contact the service department of 

company Fritz Driescher KG in Wegberg, phone 0049 (0)2434/81-1 

 

 DRIESCHER 

 WEGBERG 

 DRIESCHER 

 WEGBERG 

Reviews: