HeatMax II Furnace Installation and Operation Manual
11
3.3.1
Clearances with single and double wall pipe
CANADA
USA
A
16" (406 mm) (from the back
of the blower box)
16" (406 mm) (from the back of
the blower box)
B
18" (457 mm)
18" (457 mm)
C
5" (127 mm)
5" (127 mm)
D
1" (25 mm)
1" (25 mm)
E
69" (175 cm) minimum
69" (175 cm) minimum
F
11" (279 mm)
11" (279 mm)
G*
24" (610 mm)
24" (610 mm)
*Required for maintenance or replacement of components, however a 30" (762 mm)
clearance is suggested.
3.3.2 Cold air return ductwork Clearances
The cold air return system can be connected to a new or to an existing cold air return
ductwork. In both cases, the minimum clearance to combustible material is 0" (0 mm).
Summary of Contents for DF01001
Page 30: ...HeatMax II Furnace Installation and Operation Manual 30 ...
Page 64: ...HeatMax II Furnace Installation and Operation Manual 64 11 Exploded diagram and parts list ...
Page 65: ...HeatMax II Furnace Installation and Operation Manual 65 ...
Page 66: ...HeatMax II Furnace Installation and Operation Manual 66 ...
Page 67: ...HeatMax II Furnace Installation and Operation Manual 67 ...
Page 68: ...HeatMax II Furnace Installation and Operation Manual 68 ...
Page 74: ...HeatMax II Furnace Installation and Operation Manual 74 12 2 1 Technical data HeatMax II ...
Page 75: ...HeatMax II Furnace Installation and Operation Manual 75 ...