HeatPack Furnace Installation and Operation Manual
12
MINIMUM CLEARANCES
12
A
14
"
(356mm)
B
18
"
(457mm)
C
5
"
(127mm)
D
1
"
(25mm)
E
72"
(1828 mm)
F
11
"
(279 mm)
G
24
"
(610 mm)
REQUIRED MEASURMENTS
X
3
24
"
(610mm)
5.3.2 Cold air return ductwork Clearances
The air return duct can be connected to a
new or to an existing air return ductwork. In
both cases, the minimum clearance to
combustible material is 0" (0 mm).
1
Clearances applicable for Canada and United States.
2
Clearances applicable for single or double wall pipe.
3
Required for maintenance or replacement of components. However a 30
"
(762 mm) clearance is
suggested.
Summary of Contents for HeatPack DF00500
Page 29: ...HeatPack Furnace Installation and Operation Manual 29...
Page 64: ...HeatPack Furnace Installation and Operation Manual 64 13 Exploded diagram and parts list...
Page 65: ...HeatPack Furnace Installation and Operation Manual 65...
Page 66: ...HeatPack Furnace Installation and Operation Manual 66...
Page 67: ...HeatPack Furnace Installation and Operation Manual 67...
Page 68: ...HeatPack Furnace Installation and Operation Manual 68...
Page 69: ...HeatPack Furnace Installation and Operation Manual 69...
Page 75: ...HeatPack Furnace Installation and Operation Manual 75 14 2 1 Technical data HeatPack...
Page 76: ...HeatPack Furnace Installation and Operation Manual 76...