HeatPack Furnace Installation and Operation Manual
22
7.2.3 Assembling the plenum extension (A) with the plenum (B)
Slide plenum
(B)
over the plenum extension
(A)
to
the extent determined in
section 7 - Hot air
distribution and air return system
Using 13 self-drilling screws, secure
the plenum
(B)
to the plenum
extension
(A)
.
Summary of Contents for HeatPack DF00500
Page 29: ...HeatPack Furnace Installation and Operation Manual 29...
Page 64: ...HeatPack Furnace Installation and Operation Manual 64 13 Exploded diagram and parts list...
Page 65: ...HeatPack Furnace Installation and Operation Manual 65...
Page 66: ...HeatPack Furnace Installation and Operation Manual 66...
Page 67: ...HeatPack Furnace Installation and Operation Manual 67...
Page 68: ...HeatPack Furnace Installation and Operation Manual 68...
Page 69: ...HeatPack Furnace Installation and Operation Manual 69...
Page 75: ...HeatPack Furnace Installation and Operation Manual 75 14 2 1 Technical data HeatPack...
Page 76: ...HeatPack Furnace Installation and Operation Manual 76...