HeatPack Furnace Installation and Operation Manual
30
9.2 Installation and connection of the “RTD” thermal probe
IMPORTANT
THE PROPER POSITIONING OF THE “RTD” THERMAL PROBE IS ESSENTIAL TO
THE PROPER FUNCTIONING OF THE FURNACE. INSTALL IT IN THE OPENING
PROVIDED FOR THIS PURPOSE ON THE START-OFF PLENUM.
9.2.1 With plenum (B) only
Step 1.
Pre drill the four plate holes
(L)
on the plenum with a 1/8
"
drill bit. Using 4 self-
drilling screws
(D)
, install the plate
(L)
supplied with the furnace on the plenum
(B)
. Make
sure to have the notch on the plate up.
Step 2.
Install the bottom of the RTD probe support
(M)
on the furnace using 2 screws
(C).
Summary of Contents for HeatPack DF00500
Page 29: ...HeatPack Furnace Installation and Operation Manual 29...
Page 64: ...HeatPack Furnace Installation and Operation Manual 64 13 Exploded diagram and parts list...
Page 65: ...HeatPack Furnace Installation and Operation Manual 65...
Page 66: ...HeatPack Furnace Installation and Operation Manual 66...
Page 67: ...HeatPack Furnace Installation and Operation Manual 67...
Page 68: ...HeatPack Furnace Installation and Operation Manual 68...
Page 69: ...HeatPack Furnace Installation and Operation Manual 69...
Page 75: ...HeatPack Furnace Installation and Operation Manual 75 14 2 1 Technical data HeatPack...
Page 76: ...HeatPack Furnace Installation and Operation Manual 76...