HeatPack Furnace Installation and Operation Manual
31
Step 3.
Pre drill the two top RTD probe support holes with a 1/8
" drill bit in the furnace
plenum.
Secure it in place with two screws
(C)
.
Step 4.
Install the RTD probe
(N)
in its support and secure it in place with 2 screws
(C)
.
Plug the RTD probe in the connector located at the back of the furnace.
Summary of Contents for HeatPack DF00500
Page 29: ...HeatPack Furnace Installation and Operation Manual 29...
Page 64: ...HeatPack Furnace Installation and Operation Manual 64 13 Exploded diagram and parts list...
Page 65: ...HeatPack Furnace Installation and Operation Manual 65...
Page 66: ...HeatPack Furnace Installation and Operation Manual 66...
Page 67: ...HeatPack Furnace Installation and Operation Manual 67...
Page 68: ...HeatPack Furnace Installation and Operation Manual 68...
Page 69: ...HeatPack Furnace Installation and Operation Manual 69...
Page 75: ...HeatPack Furnace Installation and Operation Manual 75 14 2 1 Technical data HeatPack...
Page 76: ...HeatPack Furnace Installation and Operation Manual 76...