HeatPro Furnace Installation and Operation Manual
24
5.3 Installation of the assembled plenum on the furnace
Identify the rear side of the plenum, it
is provided with holes for the
installation of the “RTD” thermal probe.
Also, four holes are aligned with the
fold of the top of the furnace at the
rear side and three holes on the front
side. This allows you to secure the
plenum properly.
Install the assembly on the furnace,
taking care to insert the 4 fold on top
of the furnace inside the plenum.
Using 13 screws, secure the plenum to
the furnace.
Summary of Contents for HEATPRO DF03000
Page 30: ...HeatPro Furnace Installation and Operation Manual 30 ...
Page 62: ...HeatPro Furnace Installation and Operation Manual 62 11 Exploded diagram and parts list ...
Page 68: ...HeatPro Furnace Installation and Operation Manual 68 12 2 1 Technical data HeatPro ...
Page 69: ...HeatPro Furnace Installation and Operation Manual 69 ...