HeatPro Furnace Installation and Operation Manual
25
5.4 Configuration and restrictions of hot air distribution system
5.4.1 Start-off plenum
- The plenum can be adjusted from 67" (170 cm) to 88" (224 cm) depending on the
ceiling height. See Section 5.1: Hot air distribution plenum height according to the
ceiling height.
- The start-off plenum must have a minimum height of 18" (457 mm) from the top of the
furnace (X). In this case, use only the upper section of the plenum (the one with the 10
openings).
- The minimum clearance (C) between the top of the plenum and the ceiling is
5" (127 mm).
- The ducts minimum clearance (D) to combustible materials is 1" (25 mm).
- The ducts may pass through a combustible wall maintaining a clearance of 1" (25 mm)
around ducts.
Summary of Contents for HEATPRO DF03000
Page 30: ...HeatPro Furnace Installation and Operation Manual 30 ...
Page 62: ...HeatPro Furnace Installation and Operation Manual 62 11 Exploded diagram and parts list ...
Page 68: ...HeatPro Furnace Installation and Operation Manual 68 12 2 1 Technical data HeatPro ...
Page 69: ...HeatPro Furnace Installation and Operation Manual 69 ...