HeatPro Furnace Installation and Operation Manual
31
7.2 Installation and connection of the “RTD” thermal probe
IMPORTANT: The proper positioning of the “RTD” thermal probe is essential to the proper
functioning of the furnace. Install it in the opening provided for this purpose on the start-off
plenum.
With the plenum extension (A) and the plenum (B)
With 4 self-taping screws
(D), install the metal plate
on the plenum (B) to
block-off the 3 holes.
Make sure the notch
towards the bottom.
Install the RTP probe in
the plenum extension (A).
Secure the RTD probe
with
the
two
screws
provided (C).
Connect the RTD probe
on the furnace with the
connection.
Summary of Contents for HEATPRO DF03000
Page 30: ...HeatPro Furnace Installation and Operation Manual 30 ...
Page 62: ...HeatPro Furnace Installation and Operation Manual 62 11 Exploded diagram and parts list ...
Page 68: ...HeatPro Furnace Installation and Operation Manual 68 12 2 1 Technical data HeatPro ...
Page 69: ...HeatPro Furnace Installation and Operation Manual 69 ...