Special case:
Anchors assembly
Top view
Use the scaffolding when the wind doesn't
exceed 45 kmph.
If the wind exceeds 45 kmph, anchor the
scaffolding at the top or disassemble it.
Anchor
If the wind exceeds 45 kmph, it is forbidden to use the
scaffolding, even if it is anchored.
Page 17/20
With a wind speed superior to 45 kmph, it is mandatory to
either disassemble or anchor it at the top.
If you chose to anchor it:
Set the stabilizers according to the below picture
Add 2 anchors at the top.
Anchors not included in the parcel (Anchoring kit code:
20865)
Superior to
45 kmph
D040369B