20
ENGLISH
L2003212 Installation guide for DucoBox Energy Comfort (Plus) (Revision A | 18.10.2022)
06
Commissioning
06.A
DucoBox Energy Comfort (Plus) start-up
The unit must not be powered up until everything has been connected correctly. This includes the air ducting
systems as well as all electrical components� Failure to connect correctly can result in the permanent destruction
of the DucoBox Energy Comfort (Plus) or serious physical injury!
Switch on the power to the DucoBox Energy Comfort (Plus) (plug into power socket)� When the DucoBox Energy Comfort (Plus)
starts up for the first time, you will be asked to enter a few basic settings� Navigate using the arrow keys ( and ) and confirm
using
enter
( )�
General settings
LEFT-HAND / RIGHT-HAND setting
The LEFT-HAND / RIGHT-HAND setting determines the function of the channel connections� Make sure that the selected setting
matches the connections as described in page14�
OR
Fitting condensate drain
Position
The DucoBox Energy Comfort (Plus) must always be fitted with a condensate drain at the bottom� Placing the condensate drain de-
pends on the selected LEFT-HAND / RIGHT-HAND setting� The display shows the correct position in relation to the selected setting�
LEFT-HAND setting
RIGHT-HAND setting
Condensate drain RIGHT
Condensate drain LEFT
Standard siphon
Iteration
Rev. Date
Name
Description
23-Aug-17
Status Date
Status
MONTAGE_MUUR_COMFORT
mm³
dm²/m
kg/m
mm
Handelsstraat 19 - 8630 VEURNE
tel. 0032-58/330033 - fax.0032-58/330044
email: info @ duco.eu www.duco.eu
This drawing is property of Vero Duco NV and can not be copied, neither shown to
third party/externally without written permission.
0.000
0.000
Drawing Number
Volume
Coat. Surf.
Weight
Outline
MONTAGE_MUUR_COMFORT
Format: A0
Production Number:
Mat.:
Draftsman: -
Tol.: -
Scale: 0.300
-
Date: 23-Aug-17
Siphon Flat
Iteration
Rev. Date
Name
Description
23-Aug-17
Status Date
Status
MONTAGE_MUUR_COMFORT
mm³
dm²/m
kg/m
mm
Handelsstraat 19 - 8630 VEURNE
tel. 0032-58/330033 - fax.0032-58/330044
email: info @ duco.eu www.duco.eu
This drawing is property of Vero Duco NV and can not be copied, neither shown to
third party/externally without written permission.
0.000
0.000
Drawing Number
Volume
Coat. Surf.
Weight
Outline
MONTAGE_MUUR_COMFORT
Format: A0
Production Number:
Mat.:
Draftsman: -
Tol.: -
Scale: 0.300
-
Date: 23-Aug-17
Standard siphon
Iteration
Rev. Date
Name
Description
23-Aug-17
Status Date
Status
MONTAGE_MUUR_COMFORT
mm³
dm²/m
kg/m
mm
Handelsstraat 19 - 8630 VEURNE
tel. 0032-58/330033 - fax.0032-58/330044
email: info @ duco.eu www.duco.eu
This drawing is property of Vero Duco NV and can not be copied, neither shown to
third party/externally without written permission.
0.000
0.000
Drawing Number
Volume
Coat. Surf.
Weight
Outline
MONTAGE_MUUR_COMFORT
Format: A0
Production Number:
Mat.:
Draftsman: -
Tol.: -
Scale: 0.300
-
Date: 23-Aug-17
Siphon Flat
Iteration
Rev. Date
Name
Description
23-Aug-17
Status Date
Status
MONTAGE_MUUR_COMFORT
mm³
dm²/m
kg/m
mm
Handelsstraat 19 - 8630 VEURNE
tel. 0032-58/330033 - fax.0032-58/330044
email: info @ duco.eu www.duco.eu
This drawing is property of Vero Duco NV and can not be copied, neither shown to
third party/externally without written permission.
0.000
0.000
Drawing Number
Volume
Coat. Surf.
Weight
Outline
MONTAGE_MUUR_COMFORT
Format: A0
Production Number:
Mat.:
Draftsman: -
Tol.: -
Scale: 0.300
-
Date: 23-Aug-17