9
ENGLISH
L2000012 Installation guide for DucoBox Eco (Revision E.1 | 13.05.2020)
04.E
ModBus
Communication with building management systems is available, for reading out information as well as controlling the ventilation
system� This requires the DucoBox Eco to be equipped with an Communication Print� Please refer to information sheet
at www�duco�eu for more information�
04.F
Removing printed circuit board housing
The housing on top of the DucoBox needs to be released in order to connect cables to the printed circuit board� Follow the steps set
out below to do so�
Use a screwdriver to press the lips
in at the position shown and slide
the cover forwards by around 1 cm�
1
Lift the cover off the unit�
2
Cut one or more or the specified
pieces away from the housing to
connect cables�
3