background image

ENGLISH 14/05/2014

 

Page 67/87

 

DUFOUR 560 GRAND LARGE

 

17.

 

Gas system diagram 

 

Label  Description 

  

 

 

 

11 lbs (1.8 kg) gas cylinder ** 

 

CE shut-off valve (Fr. or Ger.) **

 

30 mbar CE regulator (Fr. or Ger.) ** / Pressure gauge** 

Medium-length connecting hose 

Spacer / tube 6 x 8 

 

Watertight bulkhead fitting 

 

PVC pipe 

 

6x8 copper pipe  

 

CE gas shut-off valve  

10 

Long connection hose 

 

11 
12 

13 
14 

15 

 

Stove / Oven 
Bulkhead gas locker 

T-Junction: foldaway* 
Foldaway* 

Locker for spare cylinders             
 

 

 

optional 

 

** 

Not supplied 

  

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Summary of Contents for 560 DUFOUR Grandlarge cruising escape

Page 1: ...ENGLISH 14 05 2014 1 87 DUFOUR 560 Grand Large OWNER S MANUAL YACHT DESIGN CATEGORY A IN ACCORDANCE WITH EUROPEAN DIRECTIVE 94 25 CE AS AMENDED BY EUROPEAN DIRECTIVE 2003 44 CE...

Page 2: ...ENGLISH 14 05 2014 2 87 DUFOUR 560 Grand Large This page intentionally left blank This page intentionally left blank This page intentionally left blank...

Page 3: ...the receipt acknowledgements below and give or send the last one to your agent Acknowledgement of receipt of the Owner s Manual Owner s copy to be kept in your Manual I the undersigned Name Address ow...

Page 4: ...ENGLISH 14 05 2014 4 87 DUFOUR 560 Grand Large This page intentionally left blank This page intentionally left blank This page intentionally left blank...

Page 5: ...V DRAIN SANITATION SYSTEM 17 Drainage system characteristics ISO 15083 2003 _________________________17 Pressurized fresh water pump__________________________________________17 Seacocks _____________...

Page 6: ...diagram with options 48 9 220 V electrical installation diagram 50 10 Fuse location diagram 52 11 Charging and power system diagram 54 12 12 V distribution panel diagram 57 13 Terminal block diagram...

Page 7: ...characteristics of the boat must be assessed performed and documented by qualified personnel The boatbuilder cannot be held responsible for modifications made without their approval In certain countr...

Page 8: ...the sea don t take risks In port every day the Harbor Master s Office posts weather bulletins and forecasts over the next few days M t o France on 0836 68 08 08 Navifax direct on 0836 70 18 52 VHF CRO...

Page 9: ...f proper precautions are not taken WARNING Indicates a risk that presents a high probability of death or permanent injury if proper precautions are not taken NOTE Indicates a reminder about safety rel...

Page 10: ...MLC Light displacement 17 600 kg MMO Minimum condition displacement 18 000 kg ML Maximum loading 4 300 kg Total weight of liquids all tanks full 1 195 kg MLDC Displacement with maximum load 21 900 kg...

Page 11: ...on This vessel has been assessed with the help of the Stability Index STIX a measure of overall safety with regard to stability which takes into account the effects of the length of the vessel its dis...

Page 12: ...the breaking capacity of overload protection devices Replace electrical apparatus or equipment with units exceeding the rated capacity without uprating wiring and protection Leave the boat unattended...

Page 13: ...the total consumption of these appliances remains within the capacity of your batteries Always disconnect the negative battery terminal before the positive terminal Never allow a conductive object too...

Page 14: ...ional area must be adjusted according to its length and the rating of the main circuit breaker see electrical diagram The plug must be suitable for the socket on the shore if necessary seek the advice...

Page 15: ...nder locker shut off valve The gas cylinder must always be stowed in the sealed ventilated space provided The same applies to spare or empty cylinders Keep protective devices hoods and stoppers in pla...

Page 16: ...ns to the system should be done by a qualified professional ATTENTION Do not use solutions containing ammonia DANGER Never use a flame to look for leaks Flexible hoses must be Checked regularly at lea...

Page 17: ...d be opened only in order to drain the water into the main bilge Know where to find each hand pump and its handle Locate the switch for the electric bilge pump on the electrical panel Pressurized fres...

Page 18: ...r slopping when heeling set the lever to the DRY BOWL position Operate the pump until the bowl is dry Repeat these flushing emptying operations as many times as is necessary to ensure complete emptyin...

Page 19: ...e fitted with portable extinguishers with the following capacities installed in the following locations see drawing in Appendix 17 No 1 cockpit locker within reach of the helmsman capacity 1 kg 5A34B...

Page 20: ...capacity Show members of the crew The location and operation of fire fighting equipment the location of the engine compartment discharge hole Ensure that fire fighting equipment is readily accessible...

Page 21: ...p the boat from moving and or the propeller from turning On subsequent launches a brief check of propeller fixing can be made Incorrect operation of the folding propeller will lead to vibration Regula...

Page 22: ...lines ATTENTION Depending on the trim and loading of your boat the whole of the nominal fuel capacity may not be usable Always maintain a 20 reserve for safety Avoid contact between flammable material...

Page 23: ...e that you always have enough room for stopping or for any necessary manoeuvres to avoid a collision Respect speed limits Out of courtesy and for the safety of other boats exercise care and attention...

Page 24: ...nt points mentioned in the deck fittings plan The DUFOUR 560 is equipped with a swim ladder built into the stern door In this case lower the stern door by releasing the retrieval cord then disengage t...

Page 25: ...cerning respect for the environment and to obey international regulations against pollution in the marine environment MARPOL together with the codes of good practice Do not discharge the toilets or th...

Page 26: ...are organized regularly by sailing schools and clubs XVI HANDLING TRANSPORTING HAULOUT When craning take care that the slings are correctly positioned and are not fouling the propeller the sail drive...

Page 27: ...ts in this case 12 mm galvanized chain and 22 mm max polypropylene rope Tow or be towed at a slow speed Never exceed the hull speed of a displacement boat in tow Tow line should always be made fast in...

Page 28: ...ENGLISH 14 05 2014 28 87 DUFOUR 560 Grand Large...

Page 29: ...ENGLISH 14 05 2014 29 87 DUFOUR 560 Grand Large...

Page 30: ...arantee is limited to the guarantee offered by that supplier It is stipulated that any handling transport parking or convoying costs incurred in carrying out these operations remain the sole liability...

Page 31: ...he Product documents This must be sent to DUFOUR YACHTS within thirty 30 days of the transfer This note must bear the names addresses and telephone numbers of the old owner and the Purchaser the date...

Page 32: ...r Address ZIP POST CODE City Tel Date of Purchase BEING SOLD TO Mr Ms Address ZIP POST CODE City Tel Date of Purchase Signed at date The Seller The Buyer Signed for DUFOUR YACHTS on Return the copy wi...

Page 33: ...ENGLISH 14 05 2014 Page 33 87 DUFOUR 560 GRAND LARGE This page intentionally left blank This page intentionally left blank This page intentionally left blank...

Page 34: ...allation diagram 50 10 Fuse location diagram 52 11 Charging and power system diagram 54 12 12 V distribution panel diagram 57 13 Terminal block diagram 59 14 12 V electrical installation diagram 61 15...

Page 35: ...ENGLISH 14 05 2014 Page 35 87 DUFOUR 560 GRAND LARGE 1 Presentation plan...

Page 36: ...14 Page 36 87 DUFOUR 560 GRAND LARGE 2 Accommodation layout Label Description 1 Version 3 Cabins central bed 2 Version 3 cabins bed shifted to side 3 Skipper cabin optional 4 4 cabin version 5 Pullman...

Page 37: ...ENGLISH 14 05 2014 Page 37 87 DUFOUR 560 GRAND LARGE...

Page 38: ...jamcleats 16 Bow rail 17 Port and starboard aft rails 18 Shroud chain plates 19 U bend 20 Beaching folding of spinnaker 21 Genoa Furling outhaul ratchets 22 Blocker spinnaker tack 23 Coachroof handra...

Page 39: ...ENGLISH 14 05 2014 Page 39 87 DUFOUR 560 GRAND LARGE...

Page 40: ...FOUR 560 GRAND LARGE 4 Sail plan Standard mast I 20 43 m J 6 20 m P 20 00 m E 6 20 m Self tacking jib LP 87 5 53 m Genoa LP 107 6 81 m Mainsail area 72 m Self tacking jib surface area 51 m Genoa area...

Page 41: ...ENGLISH 14 05 2014 Page 41 87 DUFOUR 560 GRAND LARGE...

Page 42: ...rd mast 1 Mainsail car settings 2 Mainsail foot 3 Reef 1 4 Reef 3 5 Mainsail halyard 6 Spinnaker halyard 7 Releasable forestay halyard 8 Self tacking jib sheet 9 Genoa halyard 10 Reef 2 11 Boom vang 1...

Page 43: ...ENGLISH 14 05 2014 Page 43 87 DUFOUR 560 GRAND LARGE...

Page 44: ...14 05 2014 Page 44 87 DUFOUR 560 GRAND LARGE 6 220 V distribution panel diagram Label Description 1 Battery charger 16A 2 Water heater 16A 3 Electrical outlet 16A 4 Electrical outlet 16A 5 Differenti...

Page 45: ...ENGLISH 14 05 2014 Page 45 87 DUFOUR 560 GRAND LARGE...

Page 46: ...n C D E F Electrical box with 32A main circuit breaker Charger CE waterproof plug connection Water heater G H 220V10A outlets 220V microwave oven I Connector back panel of electrical cabinet J G Conne...

Page 47: ...ENGLISH 14 05 2014 Page 47 87 DUFOUR 560 GRAND LARGE...

Page 48: ...r panel K 220V 115V electrical panel L M Quattro inverted outlets x3 Junction box outlets N O P Q R S T U V W X Y Z Electric box with 16A 30mA differential Electric box with 32A 30mA differential Inve...

Page 49: ...ENGLISH 14 05 2014 Page 49 87 DUFOUR 560 GRAND LARGE...

Page 50: ...hore AC connection 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Microwave oven outlet Inverter outlets x3 12V 220V 2KW inverter 220V 115V electrical panel Turbo air conditioning 12000BTU Turbo air condition...

Page 51: ...ENGLISH 14 05 2014 Page 51 87 DUFOUR 560 GRAND LARGE...

Page 52: ...reaker 150A windlass Resettable circuit breaker type C 63A Desalinator Zone D 12 V Blade fuse 15A Freezer Blade fuse 1A with gas solenoid valve Blade fuse 10A optional thruster Blade fuse 15A Cockpit...

Page 53: ...ENGLISH 14 05 2014 Page 53 87 DUFOUR 560 GRAND LARGE...

Page 54: ...cuit breaker H Auxiliary batteries 2 as std 2 as option I 200A fuse auxiliary J House batteries switch K 5 A fuse L Alternator M Distributor N Starter O Engine battery P Engine battery isolator Q Wind...

Page 55: ...ENGLISH 14 05 2014 Page 55 87 DUFOUR 560 GRAND LARGE...

Page 56: ...ENGLISH 14 05 2014 Page 56 87 DUFOUR 560 GRAND LARGE...

Page 57: ...A 5 Miscellaneous 2 10 A 6 Windlass controls 10 A 7 Pressurized water system 10 A 8 Bilge pump 15 A 9 Shower drain pumps 10 A 10 Navigation lights 10 A 11 Mooring light 10 A 12 Steaming light 10 A 13...

Page 58: ...ENGLISH 14 05 2014 Page 58 87 DUFOUR 560 GRAND LARGE...

Page 59: ...ve 3 Saloon and chart table lights 4 Mooring light 6 Cabin and toilet lights 7 Steaming light 8 Battery negative 9 HIFI 12 V outlet C C Connector 6 Engine battery test CCM 1 2 3 4 Aft water tank senso...

Page 60: ...ENGLISH 14 05 2014 Page 60 87 DUFOUR 560 GRAND LARGE...

Page 61: ...ng light 12 Mooring light 13 Deck light 14 Cockpit table refrigeration unit 15 Fuel gauge 16 Autopilot motor 17 Refrigeration unit 18 Shower waste pump 19 Electric bilge pump 20 Engine battery 140 Ah...

Page 62: ...ENGLISH 14 05 2014 Page 62 87 DUFOUR 560 GRAND LARGE...

Page 63: ...em Label Description 1 Round ceiling light switch 2 LED reading light 3 Black neoprene reading light 4 Mini chrome button 5 Square ceiling light 6 7 8 9 10 Self adhesive flexible LED Bathroom ceiling...

Page 64: ...ENGLISH 14 05 2014 Page 64 87 DUFOUR 560 GRAND LARGE...

Page 65: ...4 Rudder bearings assembly 5 Top bearing 6 80 deg section 7 Section stop 8 Chain and rudder cable kit 9 Rudder cable sheaves 10 Spacer sheaves 11 Steering cable guide plates 12 Port bulkhead device 13...

Page 66: ...ENGLISH 14 05 2014 Page 66 87 DUFOUR 560 GRAND LARGE...

Page 67: ...Fr or Ger 3 30 mbar CE regulator Fr or Ger Pressure gauge 4 Medium length connecting hose 5 Spacer tube 6 x 8 6 Watertight bulkhead fitting 7 PVC pipe 8 6x8 copper pipe 9 CE gas shut off valve 10 Lon...

Page 68: ...ENGLISH 14 05 2014 Page 68 87 DUFOUR 560 GRAND LARGE...

Page 69: ...ENGLISH 14 05 2014 Page 69 87 DUFOUR 560 GRAND LARGE...

Page 70: ...extinguishers locations 1 Cockpit locker 1 kg powder fire extinguisher 5A 34B 2 Saloon banquette 1 kg powder fire extinguisher 5A 34B 3 Galley 1 kg powder fire extinguisher 5A 34B 4 Skipper s cabin op...

Page 71: ...ENGLISH 14 05 2014 Page 71 87 DUFOUR 560 GRAND LARGE...

Page 72: ...pipe 9 Pressurized water pump unit 10 Fresh water pump 11 Water heater 12 Head shower single lever mixer tap 13 Galley single lever mixer tap 14 Deck shower 15 Bathroom mixer tap 16 1 2 3 way manifol...

Page 73: ...ENGLISH 14 05 2014 Page 73 87 DUFOUR 560 GRAND LARGE...

Page 74: ...ic bilge pump 1 25 discharge hose 2 Orca submersible bilge pump 3 Skin fitting 1 Manual bilge pump 4 Strainer with non return valve D25 5 25 discharge hose 6 Manual bilge pump 7 8 9 10 11 Skin fitting...

Page 75: ...ENGLISH 14 05 2014 Page 75 87 DUFOUR 560 GRAND LARGE...

Page 76: ...Discharge for the far end locker Discharge for the cockpit sink Chain locker rinsing GE discharge water separator Air conditioning condensation discharge Air conditioning discharge x3 Desalinator wast...

Page 77: ...ENGLISH 14 05 2014 Page 77 87 DUFOUR 560 GRAND LARGE...

Page 78: ...4 Polyester frame 5 Propeller 6 Stern tube 7 Stern gland 8 Propeller shaft 9 Coupling flange 10 Water lubricated bearing 11 Ventilation grilles 12 13 Foam insulation 14 Strainer skin fitting 15 Exhau...

Page 79: ...ENGLISH 14 05 2014 Page 79 87 DUFOUR 560 GRAND LARGE...

Page 80: ...0 GRAND LARGE 23 Gas system diagram Label Description 1 Port fuel tank 2 Fuel shut off valve 3 Overflow vent 4 Fuel deck plate 5 Tank vent 6 Starbord fuel tank 7 Coupling valves select port starboard...

Page 81: ...ENGLISH 14 05 2014 Page 81 87 DUFOUR 560 GRAND LARGE...

Page 82: ...ENGLISH 14 05 2014 Page 82 87 DUFOUR 560 GRAND LARGE...

Page 83: ...ank installation diagram Label Description 1 Skin fitting seacock 2 Waste deck plate 50 mm 3 Skin fittings 1 seacock 4 20 mm hose 5 38 mm anti odour hose 6 51 D anti odor hose 7 chromed brass vent 8 9...

Page 84: ...ENGLISH 14 05 2014 Page 84 87 DUFOUR 560 GRAND LARGE...

Page 85: ...GLISH 14 05 2014 Page 85 87 DUFOUR 560 GRAND LARGE 25 Lifting diagram Label Description See red triangular marker under deck line Light displacement 17 600 kg Midship beam 5 04 m Standard Draught 2 50...

Page 86: ...ENGLISH 14 05 2014 Page 86 87 DUFOUR 560 GRAND LARGE...

Page 87: ...ENGLISH 14 05 2014 Page 87 87 DUFOUR 560 GRAND LARGE NOTES...

Reviews: