35
Pt. No. 67436
Issue 1119
Maintenance Schedule (continued)
5 Fan Hydraulic Motor
Hydraulic Fan -connect the hoses in the following order:
First - connect Zero pressure Case Drain 3/8” hose
(1/2” BSP Female QR) to hydraulic reservoir *
Second -connect Motor Return 3/4” hose (3/4” BSP
Female QR) to tractor high flow low pressure return
port.
Finally - connect High Pressure Motor feed 1/2” hose
(1/2” BSP Male QR) to tractor remote.
Disconnect in the reverse order to prevent motor seal
damage.
*The tractor hydraulic reservoir or free drain
connection must have zero backpressure.
6 Preparing the Machine for Storage.
Locate on a dry level surface. The machine should
be stored wherever possible so the rams are not
supporting any weight. The drive chains should
be lubricated with suitable roller chain lubricant before
prolonged periods of storage.
It is recommended that maintenance be carried out at
the end of the season, giving sufficient time to obtain
spare parts and/or carry out repairs if required.
The seed and fertilizer bins must be completely emptied
and
cleaned.
‘Renovator AS5300’
Maintenance & Care
Summary of Contents for Renovator AS5300
Page 2: ......
Page 7: ...5 Pt No 67436 Issue 1119 Renovator AS5300 Dimensions Capacities...
Page 16: ...14...
Page 24: ...22 Renovator AS5300 Read Before Operation...
Page 33: ...31 Pt No 67436 Issue 1119 Renovator AS5300 Calibration Notes...
Page 45: ...43 Pt No 67436 Issue 1119 Renovator AS5300 Notes...
Page 46: ...44...
Page 50: ...48 Left Hand Tine Shown 11 12 10 1 4 2 7 8 13 3 9 5 14 9 Renovator AS5300 Tine Boot Assembly 6...
Page 54: ...52 6 7 Renovator AS5300 Bushes Mainframe Wheels 5 4 3 2 1 8 10 9 11 See page 58 for lift rams...
Page 58: ...56 1 Renovator AS5300 Bushes Wing Pivot 3 4 2 5 6 4 2 11 7 7 5 8 3 10 4 2 5 3 9...