1.5 x 2.5m (28mm) Side Store

All dimensions are approximate and subject to the limitations of the material used and the methods of manufacture

Roof membrane

Second layer of shingles
with the slots/hexagons 
facing downwards

Third layer of shingles
with the slots/hexagons 
facing downwards

Roof membrane

Nails

Shingles Installation

Step C

Shingles Installation

Step B

Summary of Contents for E3-2515SS

Page 1: ...INSTALLATION MANUAL Side Store Width 1 5m x Length 2 5m Thickness of logs 28mm E3 2515SS 28 Unique Side store Reference Number ______________________________ www dunsterhouse co uk ...

Page 2: ...ayers After the 4th one the door needs to be put into the aperture created by the wall logs and the cut down I 1700 A door brace Slot the assembled door frame in and continue to build up the walls Before you lift the apex into place you need to fasten the back purlin XN45 2500 0 0 0 A to the 2 apexes AP 28 SIDE STORE using 70mm screws Now lift the two apexes and back purlin into place on top of th...

Page 3: ... of required including 1 spare part Wall log XN28 2500 70 70 0 1 of required Top wall log IS28 2500 65 65 0 A 1 of required Purlin AP 28 SIDE STORE 2 of required Apex EN 2360 1 of required Page 2 1 5 x 2 5 28mm Side Store Components All dimensions are approximate and subject to the limitations of the material used and the methods of manufacture 45 32 585 28 64 5 1500 28 64 5 585 28 121 1500 28 121...

Page 4: ...e 2014 PP side store door 28 1 of required Page 3 1 5 x 2 5 28mm Side Store Components 1600 1960 All dimensions are approximate and subject to the limitations of the material used and the methods of manufacture 3000 3000 19 97 19 97 2300 1700 45 30 1670 19 96 19 19 19 70 19 38 1575 ACCESSORIES ITEM QTY 40 mm nails for floor roof boards 200 30mm screws for trims 25 50mm screws for fascia bearers 20...

Page 5: ...bject to the limitations of the material used and the methods of manufacture Screw this bearer to the cabin bearer using 70mm screws Front of side store Leave a minimum distance from the front of log cabin bearer to the side store front bearer 2360 582 566 566 582 250 1435 702 702 32 32 32 32 32 32 32 32 EN 2360 EN 1403 EN 1403 EN 1403 EN 1403 EN 1403 EN 1403 EN 1403 ...

Page 6: ...bject to the limitations of the material used and the methods of manufacture 1500 B28 1500 70 0 0 A28 1500 70 0 0 AP 28 SIDE STORE AP 28 SIDE STORE 45 585 1455 1500 25mm Approx I 1700 A B28 585 70 0 0 A28 585 70 0 0 cut to 1500mm Screw this trim through slots using 60mm hexscrews and washer s ...

Page 7: ...ll dimensions are approximate and subject to the limitations of the material used and the methods of manufacture Side Wall XN28 2500 70 70 0 2500 A28 2500 70 70 0 I 1700 A I 1700 A I 1700 A cut to 1500mm I 1700 A I 1700 A 30 6 5 I 1700 A ...

Page 8: ...f the material used and the methods of manufacture screw purlin to the apex using 70 mm long screws I 1700 A off cut screw to apex and log cabin wall Use one 60mm hexscrew with washer s per slot and screw as close as possible to the top side of the slots Securing side store walls to existing cabin ...

Page 9: ...Page 8 1 5 x 2 5m 28mm Side Store All dimensions are approximate and subject to the limitations of the material used and the methods of manufacture HN 3000 J 3000 F 1600 ...

Page 10: ...4 nails supplied Carefully trim off any excess at the end of the row and keep any full tongues 4 Lay a second layer of shingles on top of the first row This time rotate the shingles 180 so that the slots hexagons are running downwards Each row of shingles needs to be offset so cut the first strip into the half Nail through the center band of the tile using 4 nails supplied 5 Lay the next row of sh...

Page 11: ...limitations of the material used and the methods of manufacture Roof membrane Second layer of shingles with the slots hexagons facing downwards Third layer of shingles with the slots hexagons facing downwards Roof membrane Nails Shingles Installation Step C Shingles Installation Step B ...

Page 12: ...rial used and the methods of manufacture Roof membrane Fourth layer of shingles with the slots hexagons facing downwards and the shinlges have been offset by half a segment Shingles Installation Step D Continue this process untill you have reached the top of the roof boards Shingles Installation Step E Nails ...

Page 13: ...ed and the methods of manufacture Place one more row and secure the half that falls on top of the roof boards Roof membrane Shingles Installation Step F F 3305 ZN 1670 B N 1960 Requires to be cut ZN 1670 B N 1960 Requires to be cut 35mm Screws 35mm Screws Shingles Installation Step G Bend up against cabin side wall ...

Page 14: ...ufacture Shingles Installation Step H The diagram shown is for illustration purposes and may not look exact to your build Bend the shingles upwards so it meets the side wall of the cabin Ensure that it is pushed up against the side wall before securing into place Evenly space out the nail so no openings form in the shingles betwen each nail ...