Page 13
1.5 x 2.5m (28mm) Side Store
All dimensions are approximate and subject to the limitations of the material used and the methods of manufacture
Shingles Installation
Step H
The diagram shown is for illustration purposes and may not look exact to your build.
Bend the shingles upwards so it meets the side wall of the cabin.
Ensure that it is pushed up against the side wall before securing into place.
Evenly space out the nail so no openings form in the shingles betwen each nail.