ATT2100 TEMPERATURE TRANSMITTER
Operation Manual M2100-REV-G
28
4.4 Commissioning on the bench with Hand-Held Terminal
After and before installation, You can handle upon commissioning. However, for correctly handling and
knowing the function, before installation you have to handle upon commissioning on the bench with
Hand-Held Terminal.
Figure 4-1 Installation Flow Chart
Start
Field Install
a) Jumper/Switch Setup
b) Transmitter take up
c) Transmitter leads
e) Transmitter for Power Supply
End
Do
you
want
Bench
Calibration?
Basic Setup
a) Unit Setup
b) Range Setup
c) Damping Setup
Verify
a) Temperature Support
Yes
No
Do you satisfy Spec?
Maintenance