ATT2100 TEMPERATURE TRANSMITTER
Operation Manual M2100-REV-G
3
3-5. FAIL MODE ALARM
3-6. EEPROM-WRITE ENABLE/DISABLE MODE JUMPER
3-7. CONFIGURATION OF ALARM AND SECURITY JUMPER PROCEDURE
3-8. CONFIGURATION OF ZERO AND SPAN PROCEDURE
3-9. CONFIGURATION OF ZERO POINT ADJUSTMENT PROCEDURE
3-10. COMMISSIONING ON THE BENCH WITH HHT
3-11. LCD MESSAGES
4. INSTALLATION
4-1. OVERVIEW
4-2. SAFETY MESSAGE
4-3. WARNING
4-4. COMMISSIONING ON THE BENCH WITH HAND-HELD TERMINAL
4-5. GENERAL CONSIDERATIONS
4-6. ELECTRICAL CONSIDERATIONS
4-7. POWER SUPPLY
4-8. WIRING
4-9. LOOP
4-10. WIRING INSTALLATION
4-11. GROUNDING
4-12. POWER SUPPLY VOLTAGE AND LOAD RESISTANCE
4-13. TEMPERATURE SENSOR INSTALLATION
4-14. MECHANICAL CONSIDERATIONS