background image

User Manual

28

The first task

The second task

Summary of Contents for SES Series

Page 1: ...Zhangj agang Uchen New Energy Technology Co Ltd Att Jesscia uchen com cn Add No 999 yongjin road miaoqiao tangqiao town zhangjiagang city jiangsu province china 2020 7 22 The Second Edition ...

Page 2: ...User Manual 2 User Manual SES Series Charager Zhangjiagang Uchen New Energy Technology Co Ltd ...

Page 3: ...er includes the high voltage circuit low voltage circuit Please do not disassemble or refit by yourself The fault caused by this won t belong to the warranty Our company won t responsible for the injure caused by this This manual is used to use this product correctly It s not the configuration instruction of this product About the configuration status please read the relevant contracts of EV charg...

Page 4: ...e page 7 8 2 Product description of appearance 2 1 SES Charger page 9 2 2 E stop and incoming line page 9 4 LED screen Protect function page10 5 Technical parameters Page11 17 6 How to charge page18 7 How to use wifi page19 32 8 How to install page32 47 9 FAQ Page48 51 10 Contact page51 ...

Page 5: ...medium and small charge station It is suitable all kinds of parking lot unmanned users can charge pay etc independently Supporting smart charging Supporting APP smart control remote start charge reserving charging set charging current display and view charging status etc APP s name is DUOSIDA Charge you can find it in Google play or apple store Remark smart charging require EV charger containing W...

Page 6: ...ofessional meet the current requirements of the station also installed a residual current short circuit RCB Don t follow the safety instructions can result in danger and injury as well as damage to the equipment Check the charging station and connector and see if there are any visible damage before each use EV chargers can only be used to charge electric vehicles EVs or hybrid vehicles PHEVs Do no...

Page 7: ...User Manual 7 Product appearance and type SES Charger with cable SES Charger with socket Brief instruction ...

Page 8: ...3 Case C IEC Charging Mode Mode3 Case B Remark 1 For case B You need to buy a charging cable separately 2 a Socket outlet b Plug c Cable d Vehicle connector e Vehicle coupler f Vehicle inlet g Charging station h EV socket outlet i EV plug ...

Page 9: ...User Manual 9 Inlet wire Outlet wire 2080 Socket 2030 Annular status light LED screen Arc status light Description of appearance ...

Page 10: ...oltage Current Duration KW h Protection Class of Case Indoor and outdoor use Protection Function Over temperature protect Over voltage protect Leakage current protect E stop switch Over current protect Low voltage protect E stop switch Lightning protection ...

Page 11: ...User Manual 11 The dimensions Technical parameters ...

Page 12: ... 50 Output type EN 61851 1 MODE 3 OR MODE 2 22KW 400VAC 32A Basic functions Starting mode charge when plug smart charge for APP Reminder function charging indication and fault indication Self test function fault self position can be checked in the background after being networked Human computer interaction Safety protection Double leakage detection and protection Emergency stop button protection O...

Page 13: ... 50 Output type EN 61851 1 MODE 3 OR MODE 2 22KW 400VAC 32A Basic functions Starting mode charge when plug smart charge for APP Reminder function charging indication and fault indication Self test function fault self position can be checked in the background after being networked Human computer interaction Safety protection Double leakage detection and protection Emergency stop button protection O...

Page 14: ...er Manual 14 Charging plug V4 DSIEC2b EV32P V4 DSIEC2e EV32P Charging gun Provide 16A 32A for choosing Superior protection performance the protection level reaches IP54 working state Certification CE TUV ...

Page 15: ...nsumption 2W 2W Communication mode EMI CISPR22 EN 55022 CLASS B CISPR22 EN 55022 CLASS B EMS EN 61000 4 5 2KV 4KV perf Criteria B EN 61000 4 5 2KV 4KV perf Criteria B Executive standard EN 61851 1 EN 61851 22 EN 61851 1 EN61851 22 Protection Level IP55 storage IP54 Mated with vehicle IP55 storage IP54 Mated with vehicle Operation Temperature Humidity 30 50 5 95 non condensate 30 50 5 95 non conden...

Page 16: ...ion 2W 2W Communication mode EMI CISPR22 EN 55022 CLASS B CISPR22 EN 55022 CLASS B EMS EN 61000 4 5 2KV 4KV perf Criteria B EN 61000 4 5 2KV 4KV perf Criteria B Executive standard EN 61851 1 EN 61851 22 EN 61851 1 EN61851 22 Protection Level IP55 storage IP54 Mated with vehicle IP55 storage IP54 Mated with vehicle Operation Temperature Humidity 30 50 5 95 non condensate 30 50 5 95 non condensate A...

Page 17: ...ominal frequency 50 Hz connection technology Spring clamp technology Charging connection coupling Type 2 Length of charging cable 3 5 m 5 m 7 5 m Operation status information LED lights and LED screen IP class IP55 splash proof Residual current detection AC 30mA DC 6 mA Ventilation no ventilation is required operating temperatur 30 C 50 C Protection class I Overvoltage category III Certificaiton C...

Page 18: ...Full function motherboard Light with Top indication Light ring Bottom indication Leakage current transformer Leakage protection Current transformer Over current protection Voltage transformer Over voltage protection Under voltage protection Temperature sensor Over temperature protection Emergency stop button Emergency stop Incoming line through terminal Lightning protection device Lightning protec...

Page 19: ...icator light turn red At this time the charger needs to be unlocked with the mobile phone APP 2 Connect to the charger 2 1 In to the WiFi configuration mode 2 1 1 Use IC card to enter WiFi configuration mode Please power on again and enter WiFi configuration mode in 2 minutes 1 How to use wifi Press emergency stop switch and swiping card ...

Page 20: ... charger s WiFi Note after being connected to the WiFi network of the charger the mobile phone may prompt that it cannot connect to the Internet and keep the current connection Find the network of DUOSIDA_XXXX enter the password duosida cp Press and release the emergency stop switch repeatedly for 3 times within 10 seconds ...

Page 21: ...e scroll down again to refresh Click the screen to scroll down and refresh until the list of charge points appears After successful activation the circular and arc indicators of the charge point will turn blue 2 Click on and into the charge point details page ...

Page 22: ... is for charging status 4 This temperature for internal chip temperature higher than the internal environment temperature about 15 Status Voltage CP Status 3 Charged KW h Current Working time Internal temperature 4 Start Stop charging Schedule IC card management Device Setting Charge point management ...

Page 23: ...art charging button or use IC card to start charging 5 3 Click the stop charge button in the APP or use IC to stop charging Note if you use the APP to start charging then you need to click the stop button in APP when you want to stop charging the EV will automatically stop when it is fully charged and you must use the IC card to stop charging when you start charging by IC ...

Page 24: ...e point Example 1 1 Set the task start time 2 Set the task end time 5 Click the to add the schedule for charge Current can set the MAX charging current If write 0 will stop charge during this time To write 1 is bypass the schedule does not to manage charge point during this time 4 Send the schedule to charge point 3 The smaller number means the higher priority task ...

Page 25: ...User Manual 25 Clicking on the start time will affect the actual charging chart 5 Click the Start to enable task Click the Start from 6 00am to 18 00pm ...

Page 26: ...ly If you click the Start at 4 00AM charger will work at default 32A 2Relative The charging chart is based from start time of charging session Example 2 Time period for task control This part setting same to example1 12Hour Later and 18hour Later is from you click Start ...

Page 27: ...cycle by day or cycle by week Example3 You want to charge from 8pm to next day 6pm on Mondays to Fridays and all day on Saturdays and Sundays We can to set to two Recurring tasks Click Start before 6 00AM A click Start before 6 00AM B click Start at 8 00AM ...

Page 28: ...User Manual 28 The first task The second task ...

Page 29: ...ffective time maximum power Among them the maximum available power information is stored on IC card and other information is stored in the cache of charger Click IC Card to enter the IC card setting page Please turn on the NFC switch on your phone The APP will apply for the NFC usage authorization Please click the permission otherwise the IC card cannot be added ...

Page 30: ...ser s demand and sets the KWh limit of IC card according to the need Which chargers can be used and which chargers can not be used for the IC card set all Settings are for offline storage the electricity information is saved on the IC card and the authentication information is saved on the charger 3 Use the specified IC card to the corresponding charger and the card starts charging When the charge...

Page 31: ... switched to unavailable Available The charger is in a idle state in which the user can operate the charger Preparing The charger is in the state of preparing charging The following situations will trigger the charger to enter the state of preparation If the charger enters the state of preparation without charging it will return to the state of availability or charging completion after timeout 1 T...

Page 32: ...he charger will enter the state of charging completion if the plug is inserted and the device has timed out 2 The charging state will be entered after charge finished Reserved No support not applicable to current charger Faulted Charger error occurred 1 Installation Guide 1 1Safety and user information Please observe all safety and user information Relevant local regulations for operating electric...

Page 33: ...tel parking lots etc 2 for wall mounting or freestanding with matching Duostar stainless column 3 IP class IP 55 Splash proof Charging station should not be directly exposed to sunlight The installation site must offer protection against rain and running water or other liquids Keep away from fire to ensure personal safety The installation site must offer sufficient space ...

Page 34: ... it can be equipped with protective function This can reduce the possibility of failure and extend the life of the product If you need support please contact your supplier 1 2 Safety and user information The rated voltage must Charging station must be connected be observed to a protective earth conductor ...

Page 35: ... power supply possible 3 If unsure please contact your Specialist electrical contractor Safety and user information The power supply in the domestic power distribution box must be protected separately by a suitable and accurate dimension miniature circuit breaker C characteristic Complies with all technical safety requirements standards and guidelines Represents the current state of technology DC ...

Page 36: ...ing substrate Minimum distances measures at least must be level and firm to other technical 262 x 222 mm installations must be height x width observed The installation height is The installation site must be freely be tween 140 and 160 cm accessible floor to bottom edge of housing ...

Page 37: ...charging cable must not be The charging cable and the charging Under strain during the connector must not be driven over charging process The charging cable must not The charging cable must be coiled be kinked or twisted tightly and stored ...

Page 38: ...list electrical contractor No modifications must be made to the charging station None of the components need to be maintained by the user Different model has bit difference in size appearance and function The charging station can be installed by yourself according to the following installation procedure ...

Page 39: ...Manual 39 1 6Cleaning and maintenance Charging station must only Maintenance must be checked be cleaned using a dry cloth regularly Cable must be checked regularly if there is any damage or aging phenomenon ...

Page 40: ...User Manual 40 1 7 The installation procedure 1 71 Installation tools Electric drill Wrench adhesive tape bolt driver Pliers The knife scissors pencil screw hammer ...

Page 41: ...ess 1 First stick the drawing on the 2 Drill holes in the four corners wall with tape to decide the with an electric drill drilling hole position 3 Knock the expansion screws in 4 Hang the mounting plate on fixed holes with hammer he screw ...

Page 42: ...er Manual 42 5 Tighten the screw with a wrench 6 Tighten the screw with a wrench 7 Hang the main body of the 8 Tighten the anti theft screw to charging station on the mounting ensure outdoor safety plate ...

Page 43: ...43 1 Use a pencil to draw location 10 Use an electric drill to make where the hook needs to be punched holes in the drawing position 11 Drive the expansion screw in 12 Tighten the screw with a with a hammer wrench ...

Page 44: ...r than the line fuse itself ATTENTION If the wallbox is to be operated with an output of 11 kW it must be protected with a 20 A fuse over current protection Soll die Wallbox mit einer Leistung von 11 kW betrieben werden ist diese mit einer Sicherung von 20 A abzusichern If the wallbox is to be operated with an output of 22 kW it must be protected with a 40 A fuse over current protection Soll die W...

Page 45: ... if this increases the capacity to be maintained or with network repercussions is to be expected Charging devices for electric vehicles are also prior to commissioning to communicate Their commissioning also requires the prior consent of the network operator if their total rated power exceeds 12 kilovoltampere per electrical system is the network operator in this case obliged to express itself wit...

Page 46: ... the following tests must be carried out with an adapter for vehicle simulation CP according to VDE 0122 1 For planning installation operation and use please follow the Der Technische Leitfaden Ladeinfrastruktur Elektromobilität Version 3 Editor DKE bdew ZVEH ZVEI VDE ...

Page 47: ... o Disposal must be according to national and regional Regulations for electrical and electronic equipment respectively o Old devices and batteries must not be disposed of with household waste or bulky waste Before the device disposed of should it be rendered inoperable o Dispose of the packaging material in the Your region s usual collection container for cardboard paper and plastics ...

Page 48: ... on Individual models have no this state Electric leakage Red breathing lamp Red breathing lamp Over voltage Less voltage Red often on Blue often on Over current protection Red often on Green often on Over temperature protection Red often on Blue breathing lamp Hardware failure Red often on Green breathing lamp Power off Not bright Not bright Maintenance Notes Check whether the line is aging with ...

Page 49: ...bnormal measurement module of cover meter Maintenance or professional personnel are required to check the connection or replacement 0x00030005 GPRS communication module communication abnormal Maintenance or professional personnel are required to check the connection or replacement 0x00030006 Electric lock exceptions Reserved 0x00030010 Abnormal current voltage detection module Professional personn...

Page 50: ...re and constant humidity as possible The EV charger mustn t use in the environment that contain volatile gas or flammable explosive environment The input voltage frequency device breaker of equipment must be confirmed that conform to stipulation Safety sign v Caution this sign represents it would create danger for costumer or damage the hardware seriously if operate improperly Danger this sign rep...

Page 51: ...d happen electric shock even death The E stop switch can be pressed to cut power Don t cut the breaker or press the E stop switch when the EV charger running normally The device can t be disassembly when it is running Contact Zhangjiagang uchen new energy technology co Ltd Add No 999 Yongjin Road Miaoqiao Tangqiao Town Zhangjiagang City Jiangsu Province China Tel 86 158 5164 5966 Email Jesscia uch...

Reviews: