background image

#11177M 

P

rovidence 

t

Rellis 

ASSEMBLY INSTRUCTIONS

 

 
 
 

 
 

 

TOOLS NEEDED 

 

Drill with #2 Phillips Bit (recommended) or  

   Phillips Screwdriver 

 

 
 
 
 
 
 
 
 

 

TRELLS ASSEMBLY 

     (Refer to Drawing 1)  

 

On clean flat surface lay one 2 x 2 x 74” left post and one 2 x 2 x 74” right post with pilot holes for 
screws facing up and the routed holes for 

 x 1½ x 22” cross rails facing inward.  Starting at the 

bottom insert one of the top/bottom rails in the first routed slot.  Continue by inserting nine of the 

 x 1½ x 22” center rails.  Slide the other post onto the opposite end of the cross rails (do not 

fasten at this time).  Insert the ¼ x 1½ x 66” vertical slats through the 

 x 1½ x 22” cross rails.  

When both vertical slats are in place, gently spread the end of the panel and press the other 

top/bottom rail onto the vertical slats.  Firmly press cross rails between posts to ensure that the 

cross rails are completely inserted into each post.  Fasten the posts to the cross rails using the 1¼” 
screws, snap the screw caps over the screw heads.  Apply glue to inside edges of the 2 x 2” post 

caps for trellis posts.   

 
 
 
 
 
 
 
 
 
 
 
 

If you encounter missing or defective parts, please contact manufacturer direct at 

toll free # below.

 

Dura-Trel, Inc. ~ 

PO Box 122, Sheboygan Falls, WI  53085 ~ Toll Free 877-258-6020 

 

Reviews: