background image

DURAGRAIN PRIVACY

GATE KIT ASSEMBLY INSTRUCTIONS

USP © 2014

Step 3

 

Picket and Rail Installation 

     

Slide a Picket into the End Channel as shown in Figure 3a & 3b.

Figure 3a

Figure 3b

Picket

Picket

Upright Post

End Channel

Insert the Pocket Rail to the Upright Post slot and at the same time slide the Pocket Rail groove into the picket, as shown in Figure 

3c. Then do the same procedure for the other side Upright Post (Figure 3d).

Figure 3c

Upright Post

Picket

End Channel

Pocket Rail

Pocket Rail

Figure 3d

Use a Square Level for all the corners for proper leveling 

and alignment before doing 

Step 4

.

IMPORTANT

Slide the remaining Pickets in between the 2 Pocket Rail 

grooves and the last Upright Post (Figure 3e).

Figure 3e

End Channel

Pickets

Pocket Rail

End Channel

Picket

Upright Post

Pocket

Rail

Upright Post

Upright Post

Pocket

Rail

Summary of Contents for Duragrain Privacy

Page 1: ... abrasive cleaning pad or sponge Vinyl components should be assembled without using excessive force to avoid breakage Assemble gate after fence installation to accurately locate hinge and latch post and proper width size Gates should not be made any wider than 48 to avoid sagging from hinge post All hinge posts properly installed should have steel insert and be filled at least 75 with concrete Cut...

Page 2: ... the Upright Post using 4x Sheet Metal Screw as shown in Figure 2b 2c Completed Upright Posts with the mounted End Channel Figure 2c Pocket Rail Metal Support Step 1 Pocket Rail Metal Support Installation 4 Pieces Included Insert tightly the Metal Pocket Rail support into the empty bottom slot of the Pocket Rails on both end sides of the top and bottom Pocket Rail x4 Figure 1 Figure 1 Metal Pocket...

Page 3: ...e into the picket as shown in Figure 3c Then do the same procedure for the other side Upright Post Figure 3d Figure 3c Upright Post Picket End Channel Pocket Rail Pocket Rail Figure 3d Use a Square Level for all the corners for proper leveling and alignment before doing Step 4 IMPORTANT Slide the remaining Pickets in between the 2 Pocket Rail grooves and the last Upright Post Figure 3e Figure 3e E...

Page 4: ...Rail with Sheet Metal Screws Vinyl Screw Cap 32 pcs included 1 Pan Head Sheet Metal Screw 32 pcs included Figure 5b Pre measure and pre drilled all 4 corners of Upright Post on both sides top and bottom for the Sheet Metal Screw Figure 5a 5b Drive the Sheet Metal Screw into the Upright Post in 4 spots Figure 5c then cover the Sheet Metal Screw head with the Vinyl Screw Cap Figure 5d Vinyl Screw Ca...

Reviews: