31
IMPORTANT: USE HAND GLOVES TO PREVENT INJURY.
9
. Place the Facia support left (FSLBP & FSRBP) on
the top of Roof support as shown. Secure with (S1)
screws to Support bracket and top angle side.
FSLBP
S1
1
2
3
4
5
FSLBP
FSLBP
ASBP
FSRBP
FSRBP
FSRBP
ASBP
Fig.1
Fig.2
Fig.3
Fig.4
Fig.5
10
. Place the Roof Structure (RS4BP) on the top of
Roof support and top angle side. Secure with (S1)
screws to the top angle and Roof support as shown in
Fig. 1,2,3 & 4.
Fig.1
Fig.2
Fig.3
Fig.4
RS4BP
RS4BP
S1
S1
S1
S1
S1
RS4BP
S1
S1
RS4BP
RS4BP
1
3
2
3
4
11
. Place the Hinges Support (HS) to the roof structure
(RS4BP) and secure with (S1) screws. See fig.
RS4BP
HS
S1
RS4BP
RS4BP
HS