2
IMPORTANT: USE HAND GLOVES TO PREVENT INJURY.
3
. Fix the channel (FCCP) to all the four corners to
make a perfect frame. See Fig.
FCCP
FCCP
FCCP
4
. Assemble base bar back left (BLBP) and base
bar back right (BRBP) with four (S7) screws.
See fig. 1 & 2.
5
. Place the base bar assembly on top of the
foundation. Use (S1) screws to fix the assembly to
foundation.
Fig.1
Fig.2
S7
S1
Back
BLBP
BRBP
BLBP
BRBP
BLBP
BRBP
FCCP