14
MK3B BARGE & SPOUTING
Step 1:
Attach left hand and right hand barges (C102 &
D102) together with three rivets at top overlap.
Position Barge Flashings on gable ends. Posi-
tion Spouting (C103)on the shed and rivet to
barge Flashing at each end. Repeat with other
Spouting.
Step 2:
Centralise Barge Flashing on gable end and
rivet in place, one rivet into every second Rib.
Fit two rivets through top of Barge into Rib.
Repeat with other Barge Flashing. Check
Spoutings are straight, then rivet to Roof one
rivet every second Rib.
Summary of Contents for MK3B
Page 1: ...Quality Built In ASSEMBLY INSTRUCTIONS MK3B BASE SIZE 3380mm x 3380mm ...
Page 4: ......
Page 17: ......
Page 18: ......