23
23
ATTACHING THE BARGE FLASHING
1
1
3
17
23
SPOUTING & BARGE
FITTING THE BARGES
• Select the left hand barge flashing. This will fit in between the front
roof flashing and the back gutter. We will be attaching the barges to
the spouting at the back first and fitting the front flashing last.
• Hold the flashing in firmly against the side of the shed spanning over
the roof corrugate and down the side of the shed.
• Line the end of the barge up with the back of the spouting. The
barge should fit
over the top and bottom of the spouting
. Drill
a 3.5mm hole into the top of the spouting in the corner and fix 2 x
rivets (see arrows 1 & 2).
• Repeat the process with the barge on the other side.
• Once both barges are riveted to the top of the spouting with 2 x
rivets, it is time to fit the front barge.
• Place the Front Roof flashing over the front of the corrugated
roofing.
The front barge will also fit over the top and bottom of
the side barges
.
• We are going to hold the corner together so the corner fits snug and
place 2 x rivets into the top overlap of the front and barge flashings.
• Hold the corner together firmly and place another rivet in the
underneath overlap of the 2 barges (3).
• Repeat with the barge at the other end of the shed.
• Place 3 x rivets evenly spaced down the top of each side barge
(see the top diagram). These rivets need to go into the crest of the
corrugate profile so carefully measure where you drill the hole to
make sure it is directly over the high point in the corrugate profile to
avoid holes that may leak.
• Place 5 x more rivets into the top of the front roof flashing evenly
spaced along the width of the shed.
FRONT TOP RIVETS
BOTTOM RIVET
1
3
BACK RIVETS
Barge Flashing
Back Spouting
Barge Flashing
Barge Flashing
Back
Spouting
3
2
FRONT ROOF FLASHING-
FITS OVER TOP & BOTTOM
OF SIDE BARGES