13
13
CLADDING DETAIL
Overlap
13
WALL CLADDING - BACK & ENDS
WALL CLADDING - FRONT
• Position and screw sheet above doorway ensuring sheet is fl ush with top of top
plate and both ends of sheet are fl ush with outside of studs. (Use three 30mm
screws in each end and three screws along top plate and one 25mm tek screw
in each 320mm stud)
• Fit remaining sheets each side of doorway and screw off as above.
• Note - When attaching wall cladding always ensure top sheet is level with top
plate and ends of sheet are fl ush and parallel with studs. This will ensure that
wall panels are square. (Always screw wall sheets through the trough of the
profi le)
• Position 1st sheet fl ush with top of top plate and both ends of sheet are fl ush
with outside of studs.
• Using a 25mm tek screw, screw one end of sheet to frame. (Note - screw
approx 25mm back from end of sheet. Corner fl ashing will cover screws when
attached.)
• Repeat at the other end, ensuring top of sheet is fl ush with top of top plate.
• Screw sheet near the bottom, ensuring the ends of sheet are fl ush or parallel
with stud.
NOTE: The middle sheet will need to lap UNDER the top sheet, so don’t
screw right at the bottom of the sheet yet! The top sheet will fi nish
848mm below the top of the framing and the second sheet fi nishes
1610mm down
• Position 2nd sheet underneath the fi rst sheet, repeat above. Make sure the
above sheet is always overlapped correctly.
• Using four 25mm tek screws, repeat above steps ensuring sheet is level and
fl ush at each end.
• Position and screw bottom sheet using four 25mm tek screws.
• Using 25mm tek screws in the middle of the sheet, screw the three wall sheets
off as per plan. (fi ve screws per end of each sheet and four in the middle).
• Repeat above steps with each side wall.
1610mm
848mm