background image

 

79 

 

SEASONAL MAINTENANCE:

 

 

These maintenance tasks should be performed before each packaging season: 

 

 

Replace Film Feed Belts. 

 

Replace Vertical Heat Seal Teflon and Silicone Rubber Backup. 

 

Replace Perforator Blade and Silicone Backup. 

 

Check all Bearings and replace any that do not operate smoothly. 

 

Lubricate all Slide Mechanisms. 

 

Check all Air Cylinders for any air leaks and replace or rebuild Cylinders as needed. 

 

Check Chains and Sprockets for proper tension or wear and replace if needed. 

 

Verify  all  areas  of  the  machine  are  set  back  to  the  original  manufactures  specifications.  Use  the 
Machine Adjustment section of this manual for set-up instructions. 

 

Check belt lagging on conveyor rollers for wear (replace if needed). 

 

Check oil level in the gear boxes (add oil if needed). 

 

Check sprockets for wear (replace if needed). 

2090 Page 3 of 3

Reviews: