600
600
2250*
0
1
2
L
N
PE
Electrical installation
II
I
* or the height of
the highest shower
head / water outlet
that is permanently
installed; depending
on which is higher
Safety areas in accordance with DIN VDE 0100-701
7xxxxx xx x xx xxx0: 50 Hz, 220 - 240 V AC
7xxxxx xx x xx xxx6: 60 Hz, 220 - 240 V AC
I
N
= 16 A
I
ΔN
≤ 30 mA
Power supply
Fuse protection
RCD
Pre-installation
> Installing a permanent power supply line:
•
Pre-connect a separate fuse and residual
current operating device (RCD)
•
Pre-connect an all-pole separating main switch
outside the prescribed safety areas (0 - 2)
•
Allow the supply line to protrude by 3,000 mm
> Laying the potential equalisation cable:
•
Allow the cable to protrude by 3,000 mm
16
Connecting the whirltub (Diagram 16)
NoTE! Avoiding any malfunctions!
•
Do not fasten the cables together with cable ties.
•
Do not install the supply line parallel to the control
cables.
I
Connect the supply line to the mains supply
socket.
II
Connect the potential equalisation cable to the
whirltub.
WH_M_D-Code_Panel_Magnets/16.04.2.
7
en
Summary of Contents for D-Code 7X0095
Page 2: ...D Code 7X0095 7X0096 7X0097 7X0098 7X0099 7X0100 7X0101 2 WH_M_D Code_Panel_Magnets 16 04 2 ...
Page 58: ...20 WH_M_D Code_Panel_Magnets 16 04 2 58 ar ...
Page 59: ...600 600 2250 0 1 2 L N PE II I 16 I II 59 WH_M_D Code_Panel_Magnets 16 04 2 ar ...
Page 61: ...X 140 70 140 Ø 10 x 5 10 WH_M_D Code_Panel_Magnets 16 04 2 61 9 7 8 5 6 4 3 2 1 ...
Page 62: ...62 WH_M_D Code_Panel_Magnets 16 04 2 16 18 13 15 14 10 12 11 17 ...
Page 63: ...22 24 21 20 19 1 23 25 WH_M_D Code_Panel_Magnets 16 04 2 63 ...