Machine head
Service Instructions 745-35-10 D - 00.0 - 10/2017
43
3.9
Hook
3.9.1 Setting the height of the hook shaft
Fig. 33: Setting the height of the hook shaft (1)
Proper setting
The distance between the throat plate support (4) and the flange surface
of the hook shaft (1) must be 17.7 mm.
The exact height of the hook shaft is set using the gage (3) (part number
0244 001001).
To set the height of the hook shaft:
1.
Remove the throat plate.
2.
Remove both hooks (
WARNING
Risk of injury from moving parts!
Crushing possible.
Switch off the machine before adjusting the hook
settings.
(1)
- Flange surface of hook shaft
(2)
- Measuring sleeve
(3)
- Gage
(4)
- Throat plate support
①
②
③
④
Summary of Contents for 745-35-10 D
Page 1: ...745 35 10 D Service Instructions...
Page 6: ...Table of Contents 4 Service Instructions 745 35 10 D 00 0 10 2017...
Page 10: ...About these instructions 8 Service Instructions 745 35 10 D 00 0 10 2017...
Page 74: ...Machine head 72 Service Instructions 745 35 10 D 00 0 10 2017...
Page 84: ...Transport carriage 82 Service Instructions 745 35 10 D 00 0 10 2017...
Page 116: ...Light barriers 114 Service Instructions 745 35 10 D 00 0 10 2017...
Page 122: ...Aligning the machine head 120 Service Instructions 745 35 10 D 00 0 10 2017...
Page 128: ...Folder 126 Service Instructions 745 35 10 D 00 0 10 2017...
Page 146: ...Throw over stacker 144 Service Instructions 745 35 10 D 00 0 10 2017...
Page 282: ...Programming 280 Service Instructions 745 35 10 D 00 0 10 2017...
Page 292: ...Maintenance 290 Service Instructions 745 35 10 D 00 0 10 2017...
Page 294: ...Decommissioning 292 Service Instructions 745 35 10 D 00 0 10 2017...
Page 296: ...Disposal 294 Service Instructions 745 35 10 D 00 0 10 2017...
Page 308: ...Troubleshooting 306 Service Instructions 745 35 10 D 00 0 10 2017...
Page 337: ......