GENERAL INFORMATION

This assembly manual addresses all metal 
ceilings manufactured by durlum. The dif-
ferent sections describe the related/rel-
evant products.

durlum is a leading German manufacturer 
of metal ceilings and cladding elements, 
mainly made of galvanised sheet steel, 
aluminium and expanded metal.

The relevant products are described in the 
marketing and sales documents. They are 
both acoustically effective, and can also 
be used as design elements only. Specifi-
cally, these products are:
•  Acoustic ceilings
•  Chilled ceilings
•  CHARACTER products

durlum differentiates between a wide 
range of ceiling systems, for example S1. 
“S1” stands for system 1 clamping. In this 
system, there are different nomenclatures 
that allow a further subdivision of the sys-
tems. 

All durlum systems are systems of modular 
design. This applies not only to the sub-
structure but also the ceiling parts that are 
suspended, locked into place or placed 
on the substructure.

durlum metal ceilings comply with the 
standard EN  13964:2007 and are CE-cer-
tified. 

Appropriate static certificates are avail-
able for special systems marketed by us 
and for which no general approvals are 
available, and appropriate designs com-
pliant with EN 13964 have been construct-
ed. durlum lamps comply with standard 
EN 60598-1 and are CE-certified.

GUIDELINES

These installation instructions have been 
structured in accordance with the require-
ment of EN  13964:2007 and describe a 
proper assembly.

The description does not exempt the user 
from examining the structural conditions, 
implementing the building code regula-
tions and observing the information given 
in the building permit prior to starting as-
sembly. They have priority, but could not 
be included here.

It is advisable always to draw up assembly 
diagrams/drawings, to establish the loca-
tion where assembly is to begin and to es-
tablish the required suspension points for 
the relevant ceiling system prior to starting 
assembly.

STRUCTURAL PRECONDITIONS

Metal ceilings may usually be installed as 
soon as the building is swept clean, but 
at least when all wet work in the interior 
has been completed and the building has 
been closed.

Prior to starting assembly, the suspension 
points must be checked for their usabil-
ity, and load introduction into the building 
must be guaranteed.

When using wall mounting points, such as 
brackets or wall anchors, the load-carrying 
capacity of the wall in question must be 
checked.

If ceiling elements rest on brackets, pos-
sible wall movements must be taken into 
account.

Only anchors for which a general building 
supervisory approval is available may be 
used, and their minimum extraction force 
must be greater than 100 kg. The anchors 
must be mounted as specified by the 
relevant anchors manufacturer. We rec-
ommend performing regular tensile stress 
tests, to verify that anchors have been set 
correctly.

durlum metal ceilings are dimensioned 
such that they carry their own weight of 
the system construction plus a surface 
load amounting to 40 N/m². Higher loads 
must be taken into account or suspended 
separately in the construction, and the 
measures must be adapted to the situa-
tion at hand. Usually, built-in components 
and loads must be suspended separately.

For ceiling systems that do not allow any 
tolerance compensation within a module, 

GENERAL INFORMATION

suitable material expansions must be tak-
en into account.

Building expansion joints and tolerances 
customary in building construction must 
be taken into account accordingly.

durlum metal ceilings must always be as-
sembled by expert dry building companies 
who are capable of assessing the overall 
situation in the building, the metal ceil-
ing, the cladding surface, as well as the 
structural conditions and are able to take 
suitable precautions for ensuring proper 
assembly.

If parts from different manufacturers are 
used to assemble the ceiling, the relevant 
mounting company must provide the cer-
tificates required by EN  13964:2007 and 
must obtain suitable certificates of con-
formity itself.

Liability for proper selection of the products 
and system conformity can only be as-
sumed for the systems delivered by durlum.

To prevent the parts from becoming dirty, 
gloves must be worn during assembly. If 
the ceiling products are delivered laminat-
ed with a protective film, they must be pro-
tected from exposure to UV radiation [sun-
light], the film must likewise be removed 
from the goods no later than 4 weeks af-
ter delivery, and the storage temperature 
must not exceed 30°, since otherwise the 
adhesive on the panel may become hard-
ened, and the protective film can no long-
er be removed.

STORAGE

durlum metal ceilings are usually delivered 
on pallets. It is advisable to leave the metal 
panels on the pallets as long as possible. If 
the pallets need to be opened, the durlum 
POLYLAM

®

 should always be placed on its 

underside.

Storage must be carried out such that 
damage is excluded.

The assembly of the ceiling panels must 
not start until all dust-producing work has 
been completed [swept clean].

durlum products are certified according 
to ISO  9001 for development, production, 
sales and also for service. Nevertheless, it is 
recommended to always subject the metal 
ceilings immediately to an inspection and 
to report any complaints right away [usu-
ally immediately following delivery or within 
3 days]. Visible damage must be noted on 
the delivery note.

 

 

 

 

 

CERTIFICATE

 

The Certification Body 

of TÜV SÜD Management Service GmbH 

certifies that 

 

durlum GmbH

 

An der Wiese 5 

79650 Schopfheim 

Germany 

has established and applies a 

Quality and Environmental Management System 

for the following scope of application: 

Planning, development, manufacturing and sales of 

metal ceilings, functional ceilings, luminaires, 

lighting and daylight systems. 

Performance of audits (Report-No. 70014435) 

has furnished proof that the requirements under: 

ISO 9001:2008 

ISO 14001:2004 

ISO 50001:2011 

are fulfilled. The certificate is valid from 

2014-07-27 

until

 2017-05-29

.

 

Certificate Registration No. 

12 100/104/340 25601 TMS

 

 

 

 

 

 

 

 

 

 

 

Product Compliance Management 

Munich, 2014-06-17 

 

 

Summary of Contents for LOOP TYPE 3

Page 1: ...LOOP TYPE 3 INSTALLATION MANUAL ...

Page 2: ...rlum metal ceilings are dimensioned such that they carry their own weight of the system construction plus a surface load amounting to 40N m Higher loads must be taken into account or suspended separately in the construction and the measures must be adapted to the situa tion at hand Usually built in components and loads must be suspended separately For ceiling systems that do not allow any toleranc...

Page 3: ...k the introduction of force into the wall 7 Shorten intended fastening elements such as the M6 threaded rod or the nonius hanger to the intended length or order the correct length and mount it on the raw ceiling 8 Usually the panel layout should be started from the centre of the room in order to be able to compensate the tolerance of the room and cut the panels in half if necessary The precise arr...

Page 4: ...ux rectangulaires 956 x 1 115 mm 10 2 Magnet Magnet Magnétique 4 durlum GmbH www durlum com Subject to changes of dimensions and design Errors reserved All rights reserved Issued 08 11 2016 1 2 LOOP TYPE 3 INSTALLATION MANUAL 1 2 U 1040 LOOP steel element W2053 ST V Prim ary profile AP Secondary profile AS Magnet Screw connection W2053 ST U1042 ...

Page 5: ...PUNTEO J85 LED down lights a connecting adapter PUN J085 018 Z001 is required which is glued centrally to the back of the element Attention luminaires cannot be moun ted in the area of the secondary pro files 3 Mount ballasts drivers in the ceiling vo id possibly on U 1040 4 Perform electrical connection of the driver 5 Ensure that the LOOP elements are clean and free of grease To fasten the adapt...

Page 6: ...m is not fitted with a plug wiring should be carried out by a authorised electrician 8 Prior to acceptance align the ele ments precisely if they have been mo ved by other systems Note The lumininaire must not be coated with a heat insulating material The components are fitted with electronic components which can become damaged in case of electrosta tic discharge When handling the compo nents ensur...