- -
VALVE FUNCTION CHART
TURN SPECIFIED VALVE HANDLE TO APPROPRIATE POSITION
TO FILL:
UP
DOWN
Trough from Drum
2-4
3
Storage Tank from Drum
4
2-3
CIRCULATE:
Trough from Storage Tank
2-3
4
Trough to Trough (in-out)
2
3-4
TO EMPTY:
Trough to Storage Tank
-
1-2-3-4
Trough to Drum
1
2·3-4
Storage Tank to Drum
1-3
2
CLEAN-UP
1)
With power on, turn the metering wheel clockwise until the metering blade is against the adhesive roll.
See Fig. D.
2)
Set the multi-port valves so that the adhesive empties from the trough to the storage tank. When the
trough is empty, back the metering blade away from the adhesive roll. Disconnect the air and turn off
the power. See Fig. A and D.
3)
With power off, lift the safety guards on the feed side of machine, and remove the metering bar and
blade. Sponge clean the metering bar and blade, and reinstall it. Cover the adhesive in the storage tank
with a thin film of water, and cover the tank.
4)
Fill the empty 55 gallon adhesive drum with water for use as a water bath.
5)
Turn the air on and place valves 1 and 4 to the up position, and valves 2 and 3 to the down position. Al-
low water to circulate (drum to drum) for at least (2) minutes. Proceed to Step 6. See Fig. A.
6)
Turn the air on and adjust the valves to fill the trough with water from the 55 gallon drum. Then readjust the
valves to circulate the water from the trough to the trough (in-out), for at least five minutes. Disconnect
the air. Allow the water to remain in the stainless steel trough while the machine is not operating. See Fig. A
7)
Rotate the Selector Knob Assembly into the “Clean” position. This will allow the adhesive roll to rotate
with the guard up. The adhesive roll will be rendered inoperative when the safety guard is lifted if the
adjustment lever is not in the clean position. See Fig. C and D.
8)
With the power on, lift the safety guard. Clean the adhesive roll while it rotates with a long handled
brush from the feed side of the machine.
Do not put your hands in the GBAC.
When the roll is clean, be
sure you reposition the adjustment lever. Do not attempt to clean the adhesive roll unless the adjust-
ment lever is in the clean position. Do not render safety micro-switches inoperative. See Fig. C and D.
9)
Turn the power off. (The metering blade will have to be readjusted when next used.)
10)
Remove the exit rack and sponge it clean. Replace the exit rack.
Fig. C
Fig. D
Fig. A
Fig. B
1) NOTE: Valve #5:
is a normally open shut-off valve for models
beginning with Serial #7132 (manufactured on 10-28-80)
2)
Numbers appearing here refer to valve numbers on Valve Flow Diagram.
Clean Position
Selector Knob Assembly
H. WEISS MACHINERY & SUPPLY
H. WEISS MACHINERY & SUPPLY
PHONE: (718) 605-0395 - www.hweiss.com