18
1036100102L02 1904V002
– Unit easy to access for operation and main-
tenance.
– Easy-to-access power outlet to which the unit
is connected.
– Maintain sufficient distance to the wall (at least
20 cm).
– The compressed air pipe should be routed as
closely as possible to the place of installation
(note the length of the hose supplied).
6.3 Information about electrical
connections
i
Ensure that the connection to the mains pow-
er supply is established in accordance with
current valid national and local regulations and
standards governing the installation of low
voltage units.
i
Observe the current consumption of the unit
to be connected.
6 Requirements
6.1 Installation/setup room
The room chosen for set up must fulfil the fol-
lowing requirements:
– Closed, dry, well-ventilated room
– Should not be a room made for another pur-
pose (e. g. boiler room or wet cell)
NOTICE
Risk of overheating due to insuffi-
cient ventilation
The units generates heat. Possibility of
heat damage and/or reduced service life
of the unit.
i
Do not cover the unit.
i
Install a fan for auxiliary ventilation in
rooms where ambient temperatures
exceed
≥
40 °C while the unit is in op-
eration.
≥ 40 °C
6.2 Setup
The following conditions must be taken into ac-
count for installation:
The air is filtered when it is sucked in.
This does not alter the composition of
the air. For this reason it is important to
keep the sucked-in air free of harmful
substances (e.g. do not suck in exhaust
gases or contaminated exhaust air).
– Clean, level and sufficiently stable subsurface
(note the weight of the unit).
– Type plate easy to read.
Assembly
EN
Summary of Contents for H2A-160M
Page 2: ......