Assembly
5
Requirements
5.1
Setup
The room chosen for set up must fulfil the follow-
ing requirements:
– Dry, well-ventilated room (not made for
another purpose such as e. g. boiler room or
wet cell)
– When deployed outside, the unit must be pro-
tected against, moisture soiling and mechani-
cal damage by a housing (e.g. sheet casing).
– Set up the unit on a clean, level and sufficiently
stable surface (take the weight of the unit into
account).
– The type plate of the unit must be easily read-
able (also after installation).
– The unit must be easily accessible for opera-
tion and maintenance.
– Maintain sufficient distance (see drawing).
50
50
50
50
50
NOTICE
Risk of overheating due to insufficient
ventilation
The units generates heat. Possibility of
heat damage and/or reduced service life
of the unit.
❯
Do not cover the unit.
❯
Air must be able to flow in and out
unobstructed.
❯
Ventilation openings must be suffi-
ciently large.
❯
Installed units may require an indepen-
dent ventilation system in unfavourable
cases.
5.2
Vibration dampening
The unit generates vibrations. Suitable vibration
dampers must be used to damp these vibrations.
CAUTION
The use of rigid connections may
damage the units or the system in
which the units have been installed.
The device can be damaged from
strong shocks or device vibrations.
❯
Install vibration dampers between the
device and the system.
5.3
Installation position and fas-
tening
Install the units as near as possible to the hori-
zontal. Other fitting positions must be agreed in
advance with Dürr Technik.
5.4
Noise reduction
Raised levels of noise can develop at both the
intake ports and venting ports. Use a suitable
silencer. Air intake and exhaust filters (noise
reduction) are listed in our spare parts list.
Air filters act simultaneously as silencers.