16
EcoGun 119
OPERATION SAFETY
The product complies with regulations ad standards related to the
products of such nature.
All employees authorised with operation and maintenance
of the equipment shall be provably acquainted with safety
and health regulations for work in paint shops and with the
spraying gun operating and maintenance manual.
The operators shall perform training of the personnel and provide
them with specified personal protecting equipments. Training, resp.
more detailed information can provide the equipment supplier upon
request.
PRODUCT TESTING
»
Each piece of equipments is subject to factory functional and
pressure testing.
PRODUCT PACKING
»
Depends on individual parts of the delivery.
DISPOSAL
»
On expiration of the components, resp. gun operation life it may
be disposed to the sorted waste material upon cleaning.
»
The packing materials of the product (cat. no. 200101, see Decree
of the Environment Protection Ministry no. 381/2001 Coll.) shall be
disposed as mixed municipal waste. Used paper packing dispose
to the separate waste material.
RELATED STANDARDS
EN ISO 12100, EN ISO 13732+A2,
EN 894, EN ISO 4414, EN 1037, EN 1070, EN 1127-1, EN 13463-1,
EN 60079-0,
EN 60721-3-7/A1, EN ISO 11204,
Summary of Contents for EcoGun 119
Page 2: ......
Page 23: ...23 EcoGun 119 ...