5
Commissioning
Personnel:
Operator
+ additional qualification explosion pro-
tection
Protective equipment:
Protective gloves
Safety boots
Protective workwear
Eye protection
Respiratory protection device
Use ear protection
Requirements:
Feed cup and air hose have been con-
Fig. 3: Commissioning
1. Rinse the spray gun before filling it with
use solvent for solvent-based paints
use water for water-based paints
2. Set air control lever (1) into vertical posi-
tion.
Setting the spray pattern
Fig. 4: Setting the material flow
1. Set the material flow.
Loosen locknut (1).
Turn set screw (2) in required direc-
tion.
Right turn: less material
Left turn: more material
Tighten the locknut (1).
Commissioning
05/2018
EcoGun 910 - MSG00003EN
8/32