Issue: 18.10.2011
DVZ-SKA-”BIOMASTER”-PLUS – Pump P2
Page 5 of 6
SKA-PLUS-ANNEX P5-Eng
Maintenance/Service
Maintenance
–The information given in Section „Safety“ is to be
observed during maintenance and service operations.
Regular monitoring and servicing of the pump and drive
will prolong their service life.
General monitoring
1.The pump must not run dry.
2.The drive motor must not be overloaded.
3.Check suction and discharge pipelines for leaks.
4. An installed gland packing must drip slightly during
operation.
An installed mechanical seal must have no substantial
leakage.
5. Pressure and temperature monitoring devices must
be observed and compared with the order data sheet
and/or performance test report
6. Monitor auxiliary shaft seal systems, such as flushing,
sealing or quenching (if provided).
7. Monitor auxiliary heating or cooling systems in the
gland housing and/or suction casing (if provided).
Maintenance of components
Universal joints on the coupling rod
The universal joints on the coupling rod are lubricated
with special joint oil Type B or ET 1510 ISO 460 oil from
Tribol Lubricants GmbH, Mönchengladbach.
ATTENTION:
We have not tested other lubricants and we
cannot therefore recommend them!
The joints are lubricated for life. However, if the pump
must be opened for other reasons, we recommend that
the tightness of the joint packing is checked and that
the joint oil is changed after 8000 operating hours. When
changing the joint oil, please refer to the disassembly and
assembly instructions.
Shaft seal
The shafts are sealed either by a gland packing or a
mechanical seal.
1. Gland packing
Increased leakage from the gland packing during the
initial operating hours usually diminishes of its own
accord during the running-in period.
If necessary, tighten the hexagon nuts (202) slightly at
the gland (203).
It should be noted that the gland packing should leak
slightly. This ensures that the frictional heat generated
at the sealing surface is dissipated.
If the leakage increases excessively and cannot be
reduced by repeated, slight tightening of the
hexagonalted nuts (202), the packing rings have lost
their elasticity and must be replaced.
- Removing the old packing rings and cleaning the
gland housing
After reducing the pump pressure and removing the
gland, the old packing rings can be removed by means
of a packing puller tool with a flexible shaft.
The gland area and the hollow shaft rings must then be
carefully cleaned in the area around the packing rings.
Worn hollow shafts must be replaced (please see
disassembly and assembly instructions).
- Fitting the packing rings
ATTENTION:
Basically, the packing rings fitted must be
suitable for the operating conditions of the pump.
When cutting to size
,we recommend a straight cut
perpendicular to the shaft. In order to obtain gap-
free, parallel contact of the cut packing ring ends, the
cutting angle should be approx. 20°to both cut ends
(see Figure 1).
Summary of Contents for Biomaster PLUS Series
Page 15: ......
Page 16: ......
Page 17: ......
Page 19: ......
Page 21: ......
Page 22: ......
Page 23: ......
Page 24: ......
Page 25: ......
Page 26: ......
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 83: ...Issue 16 08 2010 Instruction Manual DVZ SKA BIOMASTER PLUS Page 33 of 39...
Page 89: ...Issue 16 08 2010 Instruction Manual DVZ SKA BIOMASTER PLUS Page 39 of 39...