INSTALLATION OF COUNTERWEIGHT
For correct counterweight installation, refer to the following procedure as well as
the illustration in Figure 13.
1. Insert the cable into the counterweight, turning it. This will result in the
detachment of the plastic ring inserted in the mouth (if necessary use a
screwdriver to aid in the detachment of the ring). Place the ring at the point on
the cable where the counterweight is to be attached.
2. Attach the counterweight on the ring by turning it and using moderate pressure.
(Counterweight sold separately).
MAINTENANCE & REPAIR
Inspect and clean wetted parts with water or damp cloth at regular intervals.
Disassembly or modifications made by the user will void the warranty and could
impair the continued safety of the product. If repair is required obtain a Return
Goods Authorization (RGA) number and send the unit, freight prepaid, to the
address below. Please include a detailed description of the problem and conditions
under which the problem was encountered.
Dwyer Instruments, Inc.
Attn: Repair Department
102 Indiana Hwy 212
Michigan City, IN 46361
DWYER INSTRUMENTS, INC.
Phone: 219/879-8000
www.dwyer-inst.com
P.O. BOX 373 • MICHIGAN CITY, INDIANA 46361, U.S.A.
Fax: 219/872-9057
e-mail: info@dwyer-inst.com
©Copyright 2010 Dwyer Instruments, Inc.
Printed in U.S.A. 12/10
FR# R3-443853-00
Figure 13-Counterweight Installation
L-CFS2:SSS-1000 12/8/10 8:39 AM Page 4
Remote Site Products - 1-888-532-2706 - www.remotesiteproducts.com
http://www.remotesiteproducts.com/p-14404-Dwyer-Mercoid-CFS2-OGDSN-30-Mechanical-Float-Switch.aspx