18
Figure 12
Place one
DXE-ECL-1000
on each slit end of the six 1" OD sections. Slide the 3/4" OD x 43" long
sections into the 1" sections and clamp them together, adjusting the 3/4" section to 39" in length as
shown in
Figure 13
.
Ensure the slit ends are horizontally aligned, not vertical. Position the element clamp about 1/4" to
3/8" away from the end of the section when tightening. Do not over-tighten which will damage the
element clamp. The clamp tightening screw should be on the bottom of the tube assembly.
Figure 13