Operation
6 — 4
APS05_011_0404GB
After completion of work, clean the machine and the delivery and
high−pr essure hoses. This ensures that the key components
continue to function correctly.
Environmental protection
During all cleaning work, observe the waste disposal regulations that
apply to your region.
Do not allow cleaning additives to enter the sewage system.
Prior to cleaning the machine with a steam jet or high−pressure
cleaner, cover or seal all openings where moisture must not enter for
reasons of safety or relating to machine operation. Control cabinets
and electrical plug−in connections are especially at risk.
Do not allow water to enter the electrical systems
Note
In the first six weeks of operation, clean all painted surfaces with
cold water only at a maximum water pressure of 5 bar. Do not use
any aggressive cleaning additives. Only after this time will the paint
have hardened completely, allowing you to use steam jets or similar
tools.
Continuation next side
6.4
Cleaning
General