SYSTEM MANUAL Version 6.03i
60
9.2. Example 2
This survey shows 5 points over
600ft. A problem was shown to exist
here as a high attenuation between
survey points #2
#3.
As in Example 1, a subsequent Close
Interval survey was carried out. The
results of this showed defects at 30ft
intervals. This spacing lined up with
the joint wrappings.
The pipeline was excavated at these
points and the defective joints re-
wrapped.
NOTE: CIPS survey did not find these
defects due to masking effects of the
CP.
Images from DCAPP and printed to
PDF.