F 12
6.3
Checking / adjusting the tamper de-
flector plate
Before each laying operating, check the
tamper adjustment.
The tamper knife (1) should touch the
knife bar ((2) on the screed).
The play (a) between the tamper deflec-
tor plate (3) and the tamper knife (1)
should be 0.5 mm across the entire
width.
A
If correction is necessary: See chapter E.
6.4
Hydraulic hoses
-
Specifically check the condition of the
hydraulic hoses.
-
Immediately replace any damaged
hoses.
f
Ageing hoses become porous and may
burst! Danger of accidents!
A
A number stamped onto the threaded
connection provides information about
the date of manufacture (A) and the
maximum pressure permitted for this
hose (B).
m
Never install hoses on top of one anoth-
er and always ensure that they are at the
correct pressure.
EB51_Verstell6.bmp
3
1
a
2
Hyd_VB610RH.eps
DHH 09/00 225 BAR
A
B
Summary of Contents for V5100TV
Page 2: ...www atlascopco com...
Page 20: ...A 2...
Page 30: ...B 10 5 Location of instruction labels and type plates 5 o 4 7 2 1 6 2 4 o 1 3...
Page 34: ...B 14...
Page 37: ...C 3 2 1 4 3...
Page 38: ...C 4...
Page 55: ...D 17 5 Screed heater PLC version 5 1 Switch cabinet for screed heater 40 42 41 43 44...
Page 57: ...D 19 5 2 Operating the control and monitoring unit 45 46 55 47 48 49 50 53 54 51 52...
Page 70: ...D 32 6 2 Operating the control and monitoring unit 100 101 110 102 103 104 105 108 109 106 107...
Page 86: ...D 48...
Page 92: ...E 6 Transport position 5 4 6 9 12 10 11 14 15 15 14 13...
Page 117: ...E 31 6 6 Material guide plate brace 1 2 3 3 4 6 5 7 9 8 10 11 II I 4...
Page 130: ...F 6 5 2 Guide tubes 1 1 2 2 2x 1 2...
Page 134: ...F 10 6 2 Cleaning the screed Emptying the tamper compartment 1 1 2 2 2a 1a 1a 3 4 3 4...
Page 150: ...F 26...
Page 152: ...www atlascopco com...