E 11
2.8
Electrical connections
On the rear wall of the paver finisher:
-
Plug connector (1) for the electrical
consumers on the screed on the
screed heater's screed switch cabinet.
-
Secure the positioned connector using
the locking clips on the socket.
-
PLC electronics: Additionally establish
plug connection (2).
A
Always seal unused connectors and
sockets with the relevant protective
caps.
On the side of the screed (left and right):
-
Sockets (2) for the connection cables
of the remote controls.
A
The screed settings on the paver finisher
can only be carried out after the electri-
cal connections have been established.
1
2
2
Summary of Contents for V5100TV
Page 2: ...www atlascopco com...
Page 20: ...A 2...
Page 30: ...B 10 5 Location of instruction labels and type plates 5 o 4 7 2 1 6 2 4 o 1 3...
Page 34: ...B 14...
Page 37: ...C 3 2 1 4 3...
Page 38: ...C 4...
Page 55: ...D 17 5 Screed heater PLC version 5 1 Switch cabinet for screed heater 40 42 41 43 44...
Page 57: ...D 19 5 2 Operating the control and monitoring unit 45 46 55 47 48 49 50 53 54 51 52...
Page 70: ...D 32 6 2 Operating the control and monitoring unit 100 101 110 102 103 104 105 108 109 106 107...
Page 86: ...D 48...
Page 92: ...E 6 Transport position 5 4 6 9 12 10 11 14 15 15 14 13...
Page 117: ...E 31 6 6 Material guide plate brace 1 2 3 3 4 6 5 7 9 8 10 11 II I 4...
Page 130: ...F 6 5 2 Guide tubes 1 1 2 2 2x 1 2...
Page 134: ...F 10 6 2 Cleaning the screed Emptying the tamper compartment 1 1 2 2 2a 1a 1a 3 4 3 4...
Page 150: ...F 26...
Page 152: ...www atlascopco com...