Dynaset Oy | Menotie 3, FI-33470 Ylöjärvi, Finland | tel: +358 3 3488 200 | info@dynaset.com | www.dynaset.com
21
HIGH PRESSURE DUST SUPPRESSION
INSTALLATION
ATTENTION!
Ensure that the filtering degree and cooling capacity of the hydraulic
system are sufficient. READ CHAPTER ”10. TECHNICAL SPECIFICATIONS” for
4.2. HYDRAULIC FLUIDS
To use proper hydraulic fluid READ CHAPTER ”6.2. Hydraulic fluids” for more
information.
4.3. POSITIONING THE HPW-DUST COMPONENTS
4.3.1. POSITIONING THE HPW-PUMP
HPW-pump is recommended to install onto bace machines upper structure. It
is recommended to use rubber cushions in HPW-pump installation to reduce
vibration and noise.
Picture 9: Positioning the HPW-pump
Summary of Contents for HPW DUST 130 DOUBLE DUST
Page 2: ......