Dynaset Oy | Menotie 3, FI-33470 Ylöjärvi, Finland | tel: +358 3 3488 200 | info@dynaset.com | www.dynaset.com
23
HIGH PRESSURE DUST SUPPRESSION
INSTALLATION
1. Basic dust suppression nozzles should be installed onto attachment tool. Nozzle
position must ensure water jet staight into to the prosessing area for example
between the crusher jaws.
2. High pressure dust suppression nozzles should be installed onto attachment
tool as well. Nozzle position should be chosen to cover as wide area as possible.
4.3.3. POSITIONING THE WATER SOLENOID VALVE
High power dust suppression is controlled by water solenoid valve, which is
recommended to install to a basic boom’s end in suitable place to be kept clean
an covered against impacts.
Picture 11: Positioning the water solenoid valve
Summary of Contents for HPW DUST 130 DOUBLE DUST
Page 2: ......