Dynaset Oy | Menotie 3, FI-33470 Ylöjärvi, Finland | tel: +358 3 3488 200 | info@dynaset.com | www.dynaset.com
30
HIGH PRESSURE DUST SUPPRESSION
OPERATION
5.4. WORKING IN COLD TEMPERATURES
To prevent pipes and HPW-DUST system from freezing in cold season, the pump,
water lines and water tank should be dewatered after a working shift. Open the
drain plug of the water tank and drain out the water. After tank is empty run the
HPW-pump dry for a while until all water is removed from water circuit.
ATTENTION!
Prevent the HPW-DUST system from freezing.
Summary of Contents for HPW DUST 130 DOUBLE DUST
Page 2: ......