Spa Operator’s Guide
Sec1:20
(XM2.ce) WIRING CONNECTIONS
Electrical Wiring
Case 1
The installation of electrical circuit jumpers is needed in certain input supply
configurations.
Use uncut jumper as supplied in the case of an input supply wiring, single-
phase 1 x 230 VAC (32 A max).
Case 2
In the case of an input supply wiring for a dual phase system
2 x 230 VAC (16 A max), you’ll need to cut off a portion of the jumper piece.
Proceed as follows:
Use a pair of pliers to firmly hold the upper half of the metal jumper, then
break off the other half.
Case 3
Please note that in a 3-phase system 1 x 230 VAC (3 x 16A)
No jumper installation is required.
Note: IMPORTANT Safely dispose of the discarded portion in
accordance with the local waste disposal legislation in force.
NOTE!
10
in.xm.ce
connections
Case 1
The installation of electrical
circuit jumpers is needed
in certain input supply
configurations.
Use uncut jumper as supplied
in the case of an input supply
wiring, single-phase 1 x 230 VAC
(32 A max).
Case 2
In the case of an input supply
wiring for a dual phase system
2 x 230 VAC (16 A max), you'll
need to cut off a portion of the
jumper piece.
Proceed as follows:
Use a pair of pliers to firmly
hold the upper half of the metal
jumper, then break off the
other half.
Case 3
Please note that in a 3-phase
system 1 x 230 VAC (3 x 16A)
No jumper installation
is required.
Electrical wiring
Important!
Safely dispose of the discarded
portion in accordance with the
local waste disposal legislation
in force.
10
in.xm.ce
connections
Case 1
The installation of electrical
circuit jumpers is needed
in certain input supply
configurations.
Use uncut jumper as supplied
in the case of an input supply
wiring, single-phase 1 x 230 VAC
(32 A max).
Case 2
In the case of an input supply
wiring for a dual phase system
2 x 230 VAC (16 A max), you'll
need to cut off a portion of the
jumper piece.
Proceed as follows:
Use a pair of pliers to firmly
hold the upper half of the metal
jumper, then break off the
other half.
Case 3
Please note that in a 3-phase
system 1 x 230 VAC (3 x 16A)
No jumper installation
is required.
Electrical wiring
Important!
Safely dispose of the discarded
portion in accordance with the
local waste disposal legislation
in force.
10
in.xm.ce
connections
Case 1
The installation of electrical
circuit jumpers is needed
in certain input supply
configurations.
Use uncut jumper as supplied
in the case of an input supply
wiring, single-phase 1 x 230 VAC
(32 A max).
Case 2
In the case of an input supply
wiring for a dual phase system
2 x 230 VAC (16 A max), you'll
need to cut off a portion of the
jumper piece.
Proceed as follows:
Use a pair of pliers to firmly
hold the upper half of the metal
jumper, then break off the
other half.
Case 3
Please note that in a 3-phase
system 1 x 230 VAC (3 x 16A)
No jumper installation
is required.
Electrical wiring
Important!
Safely dispose of the discarded
portion in accordance with the
local waste disposal legislation
in force.
Summary of Contents for Spa & Hot Tub 2016
Page 2: ......
Page 64: ...Spa Operator s Guide Sec1 62...
Page 68: ...Spa Operator s Guide Sec1 66...
Page 71: ...Spa Operator s Guide Sec1 69 NOTES...
Page 72: ...Spa Operator s Guide Sec1 70 NOTES...
Page 74: ...Spa Operator s Guide Sec1 72...
Page 75: ...Spa Operator s Guide Sec1 73...