Installation:
Step 1.
If you are retrofitting into an existing mortice
hole, this step may not be required. If you
are fitting the 9-Series into a new hole,
take the included mortice template and cut
the holes into your door. Your E-LOK 9-
Series comes with screws to suit both
wooden and aluminium doors.
Step 2.
On the door face, you'll be required to make
holes to suit the top screw, spindle and
bottom screw of the E-LOK Smart Lock.
Note the top fixing screw is adjustable.
Please cut to actual screw position.
10
Step 3.
Install the mortice lock into the door.
Ensure fixings are tight and straight.
Step 4.
Install the spindle into the outdoor handle.
Ensure that before you install, check the
arrow is pointing in the direction of the
handle. Use the included split pin to
secure spindle in place,
If the handle points to the
left, turn the arrow to the
left
If the handle points to the
right, turn the arrow to the
right
9 - S e r i e s
Summary of Contents for 9-Series
Page 1: ...905 915 User Manual...
Page 38: ...Notes 9 S e r i e s...
Page 39: ...Notes 9 S e r i e s...
Page 40: ...9 S e r i e s User Manual E LOK com Version 2112 E9UM...