6.4 Current Sensor Installation & Wiring

Once the AC voltages have been confirmed to be within acceptable limits, you are 

ready to install the current sensors. TB1, positions 5 and 6 are the inputs for Phase A, 

TB1 positions 7 and 8 are the inputs for Phase B and TB1 positions 9 and 10 are the 

Phase C inputs.

The Single-Phase option use TB1 pos 5&6 are A - TB1 pos 7&8 are B phase -factory 

installed jumper wire on positions 9&10. Factory installed jumper should not be 

removed. 

The Class 3400 meter can be used with two types of 0-2V current sensors. 

1.

Split-core current sensor. This sensor opens so that it can be attached around 

the circuit being monitored without interrupting power. Unless otherwise speci-

fied, all Class 3400 meters are supplied with this sensor type.

2.

Solid-core current sensor. This sensor does not open and requires the monitored 

conductor to be removed from the circuit to install the current sensor. This type is 

only supplied when specified at time of order.

6.4.1 Installing the Split-Core Current Sensor Assembly

1.

Each phase being monitored will require one two-piece current sensor assembly. 

Open the two-piece current sensor assembly by releasing the nylon clamp using 

a flathead screwdriver.

Fig. 5. Split Core Sensor.

2.

Reassemble the current sensor assembly around the conductor(s) to be moni-

tored. Ensure the current sensor halves marked “Load” are both facing the load 

side of the conductor. The colored arrow will be on the source side of the con-

ductor being monitored and MUST be pointed in a clockwise direction around the 

conductor being monitored. Tighten the nylon clamp to complete the assembly.

Fig. 6. Split Core Sensor.

M33213

LOAD

SOURCE

Summary of Contents for Class 3400 Meter

Page 1: ...62 0391 03 INSTALLATION INSTRUCTIONS Class 3400 Meter ADVANCED KWH DEMAND METER WITH COMMUNICATIONS E Mon 1985 Douglas Drive North Golden Valley MN 55422 www emon com info emon com...

Page 2: ...ed with your products we provide toll free technical and sales support Monday through Friday 8 00 am to 7 30 pm EST 800 334 3666 You may also reach us via email at info emon com If you have questions...

Page 3: ...16 Section 6 6 Line Voltage Current Sensor Diagnostics 16 Section 6 7 RS 485 Wiring 18 Section 6 8 RS 232 Communications 19 Section 6 9 Modem Wiring 22 Section 6 10 Modbus RTU Wiring 25 Section 6 11 B...

Page 4: ...proper installation of this meter Verify the input voltage rating and configuration on the unit panel label to ensure that it is suitable for the intended electrical service 3400 meters labeled for 12...

Page 5: ...or The protection and safety features provided by this equipment may become impaired or otherwise compromised NOTE If any trouble arises during installation or functional verification opera tions do n...

Page 6: ...is connected to the correct terminals One three terminal screw connector RS485 is for RS 485 communications One two terminal screw connection output is for a pulse output One RJ 45 jack J8 is provide...

Page 7: ...nd the board mounts on the inside of the housing door No additional connections to the display board are required The display board s LCD readout indicates the metered values as well as errors associa...

Page 8: ...Type kit split core scs solid core non supplied blank Brand Class Voltage Amperage Enclosure Communication Protocol Current Sensor Option Current Sensor Option Current Sensor Option Example E 34 208...

Page 9: ...Pollution Degree Degree 2 In Accordance With IEC 664 Installation Overvoltage Category Category III Measurement Category Category III Enclosure Material UL Type 1 JIC Steel or Type 4X Plastic Rain Tig...

Page 10: ...ed CAT 5e cable 8 conductor stranded 24 AWG Cable Connector RJ 45 termination protocol 10 100 base T Cable Distance 450 feet Load Control Contacts Contact Closure Set by user Contact Rating 28Vdc 10A...

Page 11: ...io or television reception which can be determined by turning the equipment off and on the user is encouraged to try to correct the interference by one or more of the following measures Reorient or re...

Page 12: ...hock exists Prior to performing any wiring operations review all contents of the user manual and de energize the MAINS power switch Only qualified personnel should perform installation wiring Installa...

Page 13: ...s must be installed indoors 6 2 Main Power Board Connections 1 Installing a temporary ground for ESD protection With all circuits de energized connect a temporary protective earth ground con nection f...

Page 14: ...ing of the enclosure 4 Unit MAINS Wiring The first four positions of terminal block TB1 located at the bottom left corner of the main power board are clearly labeled Phase A B C N neutral Earth Ground...

Page 15: ...ach of their respective terminal block positions and tightened down verify that each terminal block screw is securely fas tened by gently tugging on each conductor NOTE On Single phase order SP option...

Page 16: ...Repeat Step F Once the meter displays the correct line voltages and there are no error messages you are ready to connect the current sensors to the meter Before continuing with the installation verify...

Page 17: ...CLASS 3400 METER 17 62 0391 03 NOTE The meter will be reset later via the software during startup proce dures...

Page 18: ...3400 meters are supplied with this sensor type 2 Solid core current sensor This sensor does not open and requires the monitored conductor to be removed from the circuit to install the current sensor T...

Page 19: ...sor connects to two terminals one labeled Black and the other White Current sensors should be connected to the meter one at a time and verified using the current sensor diagnostic program Connect one...

Page 20: ...2 AWG SENSOR CONNECTIONS W WHITE LEAD B BLACK LEAD NEUTRAL NOT USED IN DELTA SYSTEM LITTLEFUSE PART NUMBER KLDR 100 1 10A 600 VAC INLINE FUSE PER CONDUCTOR LITTLEFUSE PART NUMBER KLDR 100 1 1 1 1 LINE...

Reviews: