3.9 Do Your Surveying Works
To do your surveying works, do the following:
1. To establish communication between the
Navigator
software and
VE115
, do the
following:
a. Make sure that the port and baud rate of GPS and echosounder are correctly
set.
b. Run the
Navigator
software.
c. In the menu bar, click
Common operation
→
.
d. To start recording, click
.
2. To start your surveying works, do one of the following:
o
If you select automatic route planning, click
in the lower right of
VEC
software. The vessel automatically starts surveying and returns to the set
return point after surveying.
o
If you select manual route planning, operate the remote control and control the
vessel.
After finishing your surveying works, take the vessel back.
3.10 Process Data
This operation is used to modify the problematic values in the measured depth data, and
take the required coordinates and depth values according to the set sampling method and
interval.
Summary of Contents for VE115
Page 1: ...Shanghai eSurvey GNSS Co Ltd 1st Edition V1 0 Unmanned Vessel Control System USER GUIDE VE115...
Page 2: ......
Page 4: ...SHANGHAI ESURVEY GNSS CO LTD...
Page 6: ...SHANGHAI ESURVEY GNSS CO LTD II...
Page 16: ...SHANGHAI ESURVEY GNSS CO LTD 10 2 Select English and click Next 3 Click Next...
Page 26: ...SHANGHAI ESURVEY GNSS CO LTD 20 2 2 2 2 2 Setting Page The Setting page is as shown as follows...
Page 53: ...SHANGHAI ESURVEY GNSS CO LTD 47 5 In Device page do the following...
Page 73: ......