COMMISSIONING

FILLING THE DOMESTIC HOT WATER AND
HEATING CIRCUITS

1.

Fill the domestic hot water circuit and bring it up to pressure

IMPORTANT
The hot water tank must be pressurised before the
heating circuit is filled.

2.

Fill the central heating circuit making sure that any air in the upper
part of the boiler and any air in the system is bled.

3.

Remove the front of the boiler.

4.

Check the electrical connections paying particular attention to the
quality of the connections on the power circuit terminals.

5.

Set all the switches on the control panel to the OFF position and
set the internal magneto-thermal circuit breaker to ON. Replace
the front of the boiler.

6.

Switch the boiler on from the external box.

7.

Set the on/off switch to the ON position and the summer/winter
selector switch to the winter position.

8.

After allowing the circulator to work for a few minutes, set the
on/off switch to the OFF position, bleed the circulation pump and
make sure that both the boiler and the system are properly bled.
Adjust the pressure to the static pressure (1 bar = 10 m – 1.5 bar
= 15 m) + 0.5 bar.

9.

The boiler is now ready to operate. Set the on/off switch to the ON
position, the summer/winter selector, the half and full power
switches and the control thermostat all to the desired positions

After a few days in operation

 

check

 for any leaks the

quality of the electrical connections and also make

 sure

there is no air in either the boiler or the system.

Switch the power supply off from the outside box
before carrying out any work.

Summary of Contents for S 380

Page 1: ...03 02 2005 66401700 A excellence in hot water Installation Operating and Servicing Instructions E tech S 160 240 290 380...

Page 2: ...not specified by ACV Failure to observe instructions regarding tests and test procedures can result in personal injury or pollution risks Note ACV reserves the right to modify the technical specifica...

Page 3: ...urface The corrugations on the outer shell of the tank increase the area of heat exchange still further and thus speed up the process of heating the domestic water Easy to set With a single command th...

Page 4: ...ater outlet Insulation Central heating flow pipe Primary expansion vessel Tank in Tank heat exchanger Drain cock Control thermostat Primary circuit Primary safety valve Domestic cold water inlet Heati...

Page 5: ...capacity L 161 242 295 295 394 394 Primary circuit capacity L 55 68 97 97 127 127 Central heating connections 1 1 1 1 1 1 Domestic hot water connections 3 4 3 4 1 1 1 1 2 1 1 2 Hot water tank exchange...

Page 6: ...380 E tech S 380 single phase tri phase mono phase tri phase Peak delivery at 40 C L 10 310 532 645 660 855 870 Peak delivery at 45 C L 10 250 452 548 561 725 739 Peak delivery at 60 C L 10 168 294 35...

Page 7: ...n any one of three directions HEATING CONNECTION The drain cock 8 and safety valve 2 must be connected to the waste water disposal system The boiler is fitted with an expansion chamber with a capacity...

Page 8: ...3 Thermostatic mixing valve 4 Hot water secondary pump it fitted 5 Non return valve 6 Hot water expansion vessel 7 Stop cock 8 Draw off valve 9 Drain cock CONTROLLER KITS KIT 1 ACV 13 00 Basic Basic...

Page 9: ...ers indicate a DIN rail terminal connection Boiler Stat 78 53 C PLEASE NOTE Due to the potential risk of ELECTRIC SHOCK this section of the manual is intended for use by a service engineer or qualifie...

Page 10: ...rnal Or External Boiler Control Clock High Temp Limit Auto Reset Boiler Stat 85 60 C Panel Stage 1 Switch Panel Stage 2 Switch Optional Internal External Clock Supply Circulating Pump Stage 1 Power Re...

Page 11: ...er This is to protect the boiler and allow the power supply to be switched off during servicing or other work on the boiler First make sure that the system complies with all current standards To avoid...

Page 12: ...Tech Single Phase Power Wiring L1 L2 L3 N To Control Circuit MCB 4 x Orange 4 x Black 4 x Red 4 x Blue To Boiler Body Green Yellow Stage 1 Power Relay 1 Stage 1 Power Relay 2 Blue Red Black Orange Bl...

Page 13: ...iler 6 Switch the boiler on from the external box 7 Set the on off switch to the ON position and the summer winter selector switch to the winter position 8 After allowing the circulator to work for a...

Page 14: ...se severe scalding Keep people away from discharges of hot water Draining the heating circuit 1 Switch the power to the boiler OFF at the mains switch installed by the electrician 2 Close the boiler s...

Page 15: ...a qualified engineer If the boiler is subject to heavy use it may require servicing more than once a year consult your service engineer for advice Before carrying out any work on the boiler switch the...

Page 16: ...ostat 3 Unscrew the safety thermostat s protective cap 4 Restart the thermostat using a blade end 5 If the system shuts down again please inform the installing engineer To ensure your system operates...

Reviews: